GrantsFeed
Grants & Funding

Construction supervision of the design and build of a transmission pipeline from Al Zumleh Reservoir to Al Za’atari Pumping Station, alongside detailed design, environmental and… vs Design and Construction of a New Water Transmission pipeline 800/700 between Al Zumleh Reservoir and Za’atari Pumping Station

Side-by-side comparison of two grants.

AttributeConstruction supervision of the design and build of a transmission pipeline from Al Zumleh Reservoir to Al Za’atari Pumping Station, alongside detailed design, environmental and…Design and Construction of a New Water Transmission pipeline 800/700 between Al Zumleh Reservoir and Za’atari Pumping Station
TypeTenderTender
Funding amount
DeadlineCloses 2026-07-27Closes 2026-08-17
RegionJordanJordan
SectorEnvironmentEnvironment
FunderJordan Water Sector Efficiency ProjectJordan Water Sector Efficiency Project
Who it's for