Construction supervision of the design and build of a transmission pipeline from Al Zumleh Reservoir to Al Za’atari Pumping Station, alongside detailed design, environmental and… vs Design and Construction of a New Water Transmission pipeline 800/700 between Al Zumleh Reservoir and Za’atari Pumping Station
Side-by-side comparison of two grants.
| Attribute | Construction supervision of the design and build of a transmission pipeline from Al Zumleh Reservoir to Al Za’atari Pumping Station, alongside detailed design, environmental and… | Design and Construction of a New Water Transmission pipeline 800/700 between Al Zumleh Reservoir and Za’atari Pumping Station |
|---|---|---|
| Type | Tender | Tender |
| Funding amount | — | — |
| Deadline | Closes 2026-07-27 | Closes 2026-08-17 |
| Region | Jordan | Jordan |
| Sector | Environment | Environment |
| Funder | Jordan Water Sector Efficiency Project | Jordan Water Sector Efficiency Project |
| Who it's for | — | — |