Construction supervision of the design and build of a transmission pipeline from Al Zumleh Reservoir to Al Za’atari Pumping Station, alongside detailed design, environmental and… vs France – Refuse and waste related services – EXPLOITATION DES DECHETTERIES
Side-by-side comparison of two grants.
| Attribute | Construction supervision of the design and build of a transmission pipeline from Al Zumleh Reservoir to Al Za’atari Pumping Station, alongside detailed design, environmental and… | France – Refuse and waste related services – EXPLOITATION DES DECHETTERIES |
|---|---|---|
| Type | Tender | Tender |
| Funding amount | — | $18.6M |
| Deadline | Closes 2026-07-27 | Closes 2026-09-11 |
| Region | Jordan | FRA |
| Sector | Environment | Environment |
| Funder | Jordan Water Sector Efficiency Project | SDED 52 |
| Who it's for | — | — |