Construction supervision of the design and build of a transmission pipeline from Al Zumleh Reservoir to Al Za’atari Pumping Station, alongside detailed design, environmental and… vs Increasing competitiveness and resilience of multimodal freight transport and logistics for competitive supply chains
Side-by-side comparison of two grants.
| Attribute | Construction supervision of the design and build of a transmission pipeline from Al Zumleh Reservoir to Al Za’atari Pumping Station, alongside detailed design, environmental and… | Increasing competitiveness and resilience of multimodal freight transport and logistics for competitive supply chains |
|---|---|---|
| Type | Tender | Grant |
| Funding amount | — | $7.4M |
| Deadline | Closes 2026-07-27 | Closes 2026-10-08 |
| Region | Jordan | EU |
| Sector | Environment | Environment |
| Funder | Jordan Water Sector Efficiency Project | European Commission (HORIZON) |
| Who it's for | — | — |