Cyprus – Construction work – Design and Construction of a Photovoltaic System, with a capacity of up to 180 kW, within KODAP's privately-owned terminal, at the Vasilikos Energy Center vs Italy – Maintenance hangar construction work – Venaria Reale (TO) - Aeroporto M. Santi (ID 810) - Realizzazione di un nuovo hangar, piazzole e fabbricato servizi
Side-by-side comparison of two grants.
| Attribute | Cyprus – Construction work – Design and Construction of a Photovoltaic System, with a capacity of up to 180 kW, within KODAP's privately-owned terminal, at the Vasilikos Energy Center | Italy – Maintenance hangar construction work – Venaria Reale (TO) - Aeroporto M. Santi (ID 810) - Realizzazione di un nuovo hangar, piazzole e fabbricato servizi |
|---|---|---|
| Type | Tender | Tender |
| Funding amount | $205K | $34.8M |
| Deadline | Closes 2026-09-17 | Closes 2026-09-10 |
| Region | CYP | ITA |
| Sector | Construction | Construction |
| Funder | CYPRUS ORGANISATION FOR STORAGE AND MANAGEMENT OF OIL STOCKS (COSMOS) | COMANDO INFRASTRUTTURE |
| Who it's for | — | — |