Design Supervision of Baganuur–Choir 220 kV Transmission Line and Expansion of Associated Substations vs Portugal – Electricity – Aquisição de energia elétrica para as instalações do Metropolitano de Lisboa, E.P.E. e Metrocom SA (Outubro de 2026 a Março 2028) – Proc. N.º 032/2026-DLO/ML
Side-by-side comparison of two grants.
| Attribute | Design Supervision of Baganuur–Choir 220 kV Transmission Line and Expansion of Associated Substations | Portugal – Electricity – Aquisição de energia elétrica para as instalações do Metropolitano de Lisboa, E.P.E. e Metrocom SA (Outubro de 2026 a Março 2028) – Proc. N.º 032/2026-DLO/ML |
|---|---|---|
| Type | Tender | Tender |
| Funding amount | — | $23.4M |
| Deadline | Closes 2026-07-16 | Closes in 13 days |
| Region | Mongolia | PRT |
| Sector | Energy | Energy |
| Funder | Third Energy Sector Project | Metropolitano de Lisboa, EPE |
| Who it's for | — | — |