Design, Supply, Installation, and O&M of Integrated Solar PV Streetlight System for Selected Roadways in Liberia Phase II vs Zero Emission Vessels and Infrastructure 2: Energy Efficiency
Side-by-side comparison of two grants.
| Attribute | Design, Supply, Installation, and O&M of Integrated Solar PV Streetlight System for Selected Roadways in Liberia Phase II | Zero Emission Vessels and Infrastructure 2: Energy Efficiency |
|---|---|---|
| Type | Tender | Grant |
| Funding amount | — | $40.1M |
| Deadline | Closes 2026-08-10 | Closes 2026-09-16 |
| Region | Liberia | GB |
| Sector | Energy | Energy |
| Funder | Liberia Electricity Sector Strengthening and Access Project (LESSAP) Phase 2 | Department for Transport |
| Who it's for | — | nonprofits, government, for-profit |