France – Heating, ventilation and air-conditioning installation work – MAINTENANCE DES INSTALLATIONS DE CHAUFFAGE / VENTILATION / CLIMATISATION DU CENTRE HOSPITALIER DU VINATIER vs France – Non-metal joinery installation work – ARRAS - Résidence St Pol - Voie Chateaubriand, Remplacement des menuiseries extérieures et de la VMC
Side-by-side comparison of two grants.
| Attribute | France – Heating, ventilation and air-conditioning installation work – MAINTENANCE DES INSTALLATIONS DE CHAUFFAGE / VENTILATION / CLIMATISATION DU CENTRE HOSPITALIER DU VINATIER | France – Non-metal joinery installation work – ARRAS - Résidence St Pol - Voie Chateaubriand, Remplacement des menuiseries extérieures et de la VMC |
|---|---|---|
| Type | Tender | Tender |
| Funding amount | — | $1.6M |
| Deadline | Closes 2026-08-03 | Closes in 4 days |
| Region | FRA | FRA |
| Sector | Construction | Construction |
| Funder | HOSPICES CIVILS DE LYON-GHT VAL RHONE CENTRE | Pas-de-Calais habitat |
| Who it's for | — | — |