Package I: NCB distribution system installation for 15 mini-grids (7.5% of the total EEU led mini grids (201 mini-grids) under Component 2.1, Retenderd vs Portugal – Electricity – Aquisição de energia elétrica para as instalações do Metropolitano de Lisboa, E.P.E. e Metrocom SA (Outubro de 2026 a Março 2028) – Proc. N.º 032/2026-DLO/ML
Side-by-side comparison of two grants.
| Attribute | Package I: NCB distribution system installation for 15 mini-grids (7.5% of the total EEU led mini grids (201 mini-grids) under Component 2.1, Retenderd | Portugal – Electricity – Aquisição de energia elétrica para as instalações do Metropolitano de Lisboa, E.P.E. e Metrocom SA (Outubro de 2026 a Março 2028) – Proc. N.º 032/2026-DLO/ML |
|---|---|---|
| Type | Tender | Tender |
| Funding amount | — | $23.4M |
| Deadline | Closes 2026-06-29 | Closes 2026-07-08 |
| Region | Ethiopia | PRT |
| Sector | Energy | Energy |
| Funder | Access to Distributed Electricity and Lighting in Ethiopia (ADELE) | Metropolitano de Lisboa, EPE |
| Who it's for | — | — |