Procurement of: Supply, installation, testing, commissioning, and maintenance of hyper‑converged infrastructure (HCI) and AD/LDAP solution for the Department of Meteorology.
Procurement of: Supply, installation, testing, commissioning, and maintenance of hyper‑converged infrastructure (HCI) and AD/LDAP solution for the Department of Meteorology.
Don't miss the next one like this
New environment grants in Sri Lanka open all the time. Get a free weekly email with only the ones that match — nothing else.
Want help winning this?
Enter your email and we'll send the official application link, deadlines and pointers right away — free. Want a hand? Tick the box and we'll introduce you to a vetted grant or bid writer. The intro's free, and you only pay if you choose to work with them.
Related opportunities
See all alternatives →More grants — Environment · Sri Lanka
Supply, Deployment, Commissioning, Maintenance, and Operational Support of Metocean Mooring Buoy for the Department of Meteorology, Sri Lanka
→Supply, Deployment, Commissioning, Maintenance, and Operational Support of Metocean Mooring Buoy for the Department of Meteorology, Sri Lanka
TenderCloses 2026-09-04Sri LankaEnvironmentProcurement of Supply, Installation, and Commissioning of Five Coastal Metocean Automated Observation Stations at Designated Coastal Locations in Sri Lanka for the Department of…
→Procurement of Supply, Installation, and Commissioning of Five Coastal Metocean Automated Observation Stations at Designated Coastal Locations in Sri Lanka for the Department of Meteorology
TenderCloses 2026-09-04Sri LankaEnvironmentProcurement of Supply, Installation, Testing, Commissioning, and Maintenance of Upgraded Network Security, Switching, Wi‑Fi, and Structured Cabling Systems for the Department of…
→Procurement of Supply, Installation, Testing, Commissioning, and Maintenance of Upgraded Network Security, Switching, Wi‑Fi, and Structured Cabling Systems for the Department of Meteorology.
TenderCloses 2026-08-13Sri LankaEnvironmentProcurement of: Supply, installation, testing, commissioning, and maintenance of 1 PB file storage system for the Department of Meteorology.
→Procurement of: Supply, installation, testing, commissioning, and maintenance of 1 PB file storage system for the Department of Meteorology.
TenderCloses 2026-08-13Sri LankaEnvironmentSupporting financing of local adaptation actions with combination of public funding and private financing
→Expected Outcome: In support to the implementation of the EU Adaptation Strategy, the EU Mission on Adaptation to Climate change, and in particular having regard to the upcoming European Climate Adaptation Plan, project results should contribute to all of the following expected outcomes: Local climate adaptation actors, the financing sector, the public grant sector, and climate adaptation financing experience are brought to work together on making local adaptation actions financeable by combining public grant funding and private financing via bank loans and on overcoming the practical barriers on combining these and finding solutions, and specifically through demonstrating this with intermediated EIB adaptation lending. Local innovative adaptation actions (including nature-based solutions) have been implemented thanks to their financing by the combination of private financing via bank loans and public grant funding. National Promotional Banks (NPBs)/other banks are mobilised to actively finance local adaptation actions. Scope: Rationale Financing of local adaptation actions, especially with other means than public grant funding, is currently still not taking place sufficiently.…
Grant$22.8MCloses 2026-09-23EUEnvironmentLarge-scale demonstration for mapping the distribution and condition of marine habitats to implement the Nature Restoration Regulation
→Expected Outcome: This topic aims at directly engaging and supporting relevant public authorities with mapping at large scale the conditions of marine habitats needed for implementing the Nature Restoration Regulation and for achieving one or several objectives of the Mission Restore our Ocean and Waters [1] . The direct involvement of relevant authorities and stakeholders in the consortium is strongly encouraged. Project results are expected to contribute to all the following expected outcomes: Member States have the capacity and access to tried and tested solutions to complete the mapping of the distribution and condition of coastal and marine habitats listed in Annex II of the Nature Restoration Regulation [2] (NRR) in the waters under their jurisdiction, which is needed to fulfil the obligations under Article 5 of the NRR within the deadlines, and obligations under the Marine Strategy Framework Directive (MSFD) and the Birds and Habitats Directive (BHD); Substantial areas of habitats have been mapped and their condition assessed. Priority should be given to Groups 1-6 of Annex II, followed by Group 7 of Annex II [3] , in line with applicable deadlines; Member States have the…
Grant$8.8MCloses 2026-09-23EUEnvironment
Always confirm details on the official source before applying — see our methodology.