Construction of Gelephu - Tareythang roads and bridges on Southern East-West Highway Package-I; from Ch 0.0m to 3868.0m vs Maintenance of road through Piloting of Performance Based Maintenance Contract (PBMC) of Wangdue Zam to Chuserbu (76.3Km) and Lawala to Phobjikha (17.24Km)
Side-by-side comparison of two grants.
| Attribute | Construction of Gelephu - Tareythang roads and bridges on Southern East-West Highway Package-I; from Ch 0.0m to 3868.0m | Maintenance of road through Piloting of Performance Based Maintenance Contract (PBMC) of Wangdue Zam to Chuserbu (76.3Km) and Lawala to Phobjikha (17.24Km) |
|---|---|---|
| Type | Tender | Tender |
| Funding amount | — | — |
| Deadline | Closes in 3 days | Closes in 9 days |
| Region | Bhutan | Bhutan |
| Sector | Transport | Transport |
| Funder | Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project | Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project |
| Who it's for | — | — |
noindex — no measured search demand