Consultancy Services for Feasibility Study and Detailed Design of Irrigation Schemes in Four Woredas: Golitseha Drip Irrigation, Hobi Gravity Irrigation, Testura Gravity Irrigat… vs Procurement of Forage and poultry processing equipment for cooperatives Lot 1. Forage processing equipment for 20 centres/cooperatives Lot 2. Poultry farming production equipmen…
Side-by-side comparison of two grants.
| Attribute | Consultancy Services for Feasibility Study and Detailed Design of Irrigation Schemes in Four Woredas: Golitseha Drip Irrigation, Hobi Gravity Irrigation, Testura Gravity Irrigat… | Procurement of Forage and poultry processing equipment for cooperatives Lot 1. Forage processing equipment for 20 centres/cooperatives Lot 2. Poultry farming production equipmen… |
|---|---|---|
| Type | Tender | Tender |
| Funding amount | — | — |
| Deadline | Closes in 3 days | Closes 2026-11-17 |
| Region | Ethiopia | Ethiopia |
| Sector | Agriculture & Food | Agriculture & Food |
| Funder | Lowlands Livelihood Resilience Project, Phase Two (LLRP II) | Second Ethiopia Resilient Landscapes and Livelihoods Project |
| Who it's for | — | — |
noindex — no measured search demand