Consultancy Services for supervision of RE installations of the public buildings, time based contract.The CQS method will be applied. Since it is not a comprehensive task, suffi… vs Design, Supply and Installation for Edremit (Van) Solar Power Plant (SPP) Project
Side-by-side comparison of two grants.
| Attribute | Consultancy Services for supervision of RE installations of the public buildings, time based contract.The CQS method will be applied. Since it is not a comprehensive task, suffi… | Design, Supply and Installation for Edremit (Van) Solar Power Plant (SPP) Project |
|---|---|---|
| Type | Tender | Tender |
| Funding amount | — | — |
| Deadline | Closes 2026-09-14 | Closes 2026-09-29 |
| Region | Turkiye | Turkiye |
| Sector | Energy | Energy |
| Funder | Public and Municipal Renewable Energy Project | Sustainable Cities Project 2 |
| Who it's for | — | — |
noindex — no measured search demand