Design, Supply and Installation of the Solar Power Plant (SPP) Project for Yeşilyurt Municipality, Malatya vs RIA Resilience call reinforcing Europe's strength in 6G radio communication systems
Side-by-side comparison of two grants.
| Attribute | Design, Supply and Installation of the Solar Power Plant (SPP) Project for Yeşilyurt Municipality, Malatya | RIA Resilience call reinforcing Europe's strength in 6G radio communication systems |
|---|---|---|
| Type | Tender | Grant |
| Funding amount | — | $23.1M |
| Deadline | Closes 2026-09-08 | Closes 2026-09-16 |
| Region | Turkiye | EU |
| Sector | Energy | Energy |
| Funder | Sustainable Cities Project 2 | European Commission (HORIZON) |
| Who it's for | government | researchers |
noindex — no measured search demand