Interconnection of Jalingo Primary Water Supply Scheme Reservoir to the Existing Water Distributing Network vs SSbD bio-based solutions for home and/or personal care
Side-by-side comparison of two grants.
| Attribute | Interconnection of Jalingo Primary Water Supply Scheme Reservoir to the Existing Water Distributing Network | SSbD bio-based solutions for home and/or personal care |
|---|---|---|
| Type | Tender | Grant |
| Funding amount | — | $22.8M |
| Deadline | Closes 2026-09-03 | Closes 2026-09-22 |
| Region | Nigeria | EU |
| Sector | Environment | Environment |
| Funder | Agro-Climatic Resilience in Semi-Arid Landscapes (ACReSAL) | European Commission (HORIZON) |
| Who it's for | — | — |
noindex — no measured search demand