Maintenance of road through Piloting of Performance Based Maintenance Contract (PBMC) of Wangdue Zam to Chuserbu (76.3Km) and Lawala to Phobjikha (17.24Km) vs Supply of International Internet Bandwidth for the Government Networks under the Indefeasible Rights of Use (IRU) approach.
Side-by-side comparison of two grants.
| Attribute | Maintenance of road through Piloting of Performance Based Maintenance Contract (PBMC) of Wangdue Zam to Chuserbu (76.3Km) and Lawala to Phobjikha (17.24Km) | Supply of International Internet Bandwidth for the Government Networks under the Indefeasible Rights of Use (IRU) approach. |
|---|---|---|
| Type | Tender | Tender |
| Funding amount | — | — |
| Deadline | Closes in 10 days | Closes 2026-12-11 |
| Region | Bhutan | Bhutan |
| Sector | Transport | Transport |
| Funder | Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project | Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project |
| Who it's for | — | government |
noindex — no measured search demand