Package I: NCB distribution system installation for 15 mini-grids (7.5% of the total EEU led mini grids (201 mini-grids) under Component 2.1, Retenderd vs Zero Emission Vessels and Infrastructure 2: Electric Power
Side-by-side comparison of two grants.
| Attribute | Package I: NCB distribution system installation for 15 mini-grids (7.5% of the total EEU led mini grids (201 mini-grids) under Component 2.1, Retenderd | Zero Emission Vessels and Infrastructure 2: Electric Power |
|---|---|---|
| Type | Tender | Grant |
| Funding amount | — | $40.1M |
| Deadline | Closes 2026-06-29 | Closes 2026-09-16 |
| Region | Ethiopia | GB |
| Sector | Energy | Energy |
| Funder | Access to Distributed Electricity and Lighting in Ethiopia (ADELE) | Department for Transport |
| Who it's for | — | nonprofits, government, for-profit |