Supply, Installation, and Commissioning of Last-Mile Connectivity Infrastructure and Local Area Network (LAN) vs Supply of International Internet Bandwidth for the Government Networks under the Indefeasible Rights of Use (IRU) approach.
Side-by-side comparison of two grants.
| Attribute | Supply, Installation, and Commissioning of Last-Mile Connectivity Infrastructure and Local Area Network (LAN) | Supply of International Internet Bandwidth for the Government Networks under the Indefeasible Rights of Use (IRU) approach. |
|---|---|---|
| Type | Tender | Tender |
| Funding amount | — | — |
| Deadline | Closes 2026-11-06 | Closes 2026-12-11 |
| Region | Bhutan | Bhutan |
| Sector | Transport | Transport |
| Funder | Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project | Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project |
| Who it's for | — | government |
noindex — no measured search demand