France – Plumbing and sanitary works – Relance lot 18 : PLOMBERIE/CHAUFFAGE/VENTILATION suite à procédure infructueuse. Extension et réhabilitation des bâtiments B1, B4, B5, B6, B7 et B9 au CFA de Plérin (22)
France – Plumbing and sanitary works – Relance lot 18 : PLOMBERIE/CHAUFFAGE/VENTILATION suite à procédure infructueuse. Extension et réhabilitation des bâtiments B1, B4, B5, B6, B7 et B9 au CFA de Plérin (22)
Don't miss the next one like this
New construction grants in FRA open all the time. Get a free weekly email with only the ones that match — nothing else.
Want help winning this?
Enter your email and we'll send the official application link, deadlines and pointers right away — free. Want a hand? Tick the box and we'll introduce you to a vetted grant or bid writer. The intro's free, and you only pay if you choose to work with them.
Related opportunities
See all alternatives →More grants — Construction · FRA
Romania – Roadworks – Servicii de proiectare, asistență tehnică din partea proiectantului și lucrări de execuție aferente obiectivului de investiție: „Modernizare infrastructură rutieră de drum județean 205L pe sectoarele: int. DJ 205D (Grumaz) - Vrâncioaia, Spinești – Păulești - Tulnici - int. DN2D”
→Romania – Roadworks – Servicii de proiectare, asistență tehnică din partea proiectantului și lucrări de execuție aferente obiectivului de investiție: „Modernizare infrastructură rutieră de drum județean 205L pe sectoarele: int. DJ 205D (Grumaz) - Vrâncioaia, Spinești – Păulești - Tulnici - int. DN2D”
Tender$16.9MCloses 2026-09-01ROUConstructionCroatia – Construction work for pharmaceutical plant – Dogradnja proizvodno-skladišnog farmaceutskog objekta u Dugopolju
→Croatia – Construction work for pharmaceutical plant – Dogradnja proizvodno-skladišnog farmaceutskog objekta u Dugopolju
Tender$11.4MCloses 2026-08-17HRVConstructionJV SCS Multi-Site Utility Connection Works
→We are seeking applications from suitably qualified and accredited Independent Connection Providers (ICPs), Self-Lay Providers (SLPs), and multi-utility contractors to deliver contestable utility connection works across several active construction sites in London. Please note that the estimated contract value shown is based on a per site average. The works encompass the design, procurement, excavation, installation, testing, and commissioning of primary utility infrastructure for: - Power (HV/LV distribution and substation connections) - Water (Main tapping, metering, chlorination, and adoption prep) - Telecommunications (Ducting, chambers, and fibre integration) SCOPE OF WORKS BY UTILITY a) Power Infrastructure: - Installation of High Voltage (HV) and Low Voltage (LV) cables. - Substation base construction, transformer positioning, and jointing. - Delivery of contestable works under UK Power Networks (UKPN) adoption standards. b) Water Infrastructure: - Main connections, boundary box installations, and site distribution pipework. - Pressure testing, chlorination, and water sampling under Thames Water / Affinity Water standards. c) Telecoms & Communications: - Installation of Openreach / Virgin Media / Altnets compliant ducting and footway chambers. - Cable pulling, lead-in installation, and box terminations. LONDON OPERATIONAL CONSTRAINTS & SITE CONDITIONS Contracts will take place in high-density urban environments. Bidders must demonstrate proven capability in managing: - NRSWA Compliance & Highway Authorities: Securing Section 50/171 licenses, managing Traffic Management (TM) schemes, and adhering to London Borough / TfL permit systems. - Sub-surface Utilities: Operating in congested underground service environments utilizing PAS 128 (Type B/A) utility mapping and GPR scanning prior to excavation. - Low Emission Requirements: Compliance with London's NRMM (Non-Road Mobile Machinery) emissions standards and FORS (Fleet Operator Recognition Scheme) Silver/Gold for site deliveries. CONTRACTUAL STRUCTURE We reserve the right to award this scope as a single multi-utility package or split the requirements into trade-specific lots (Water, Power, Telecoms) depending on response quality.
Tender$6.7MCloses 2026-08-19GBConstructionCzechia – Construction work for highways, roads – II/117 Strašice - Mirošov, 4. etapa
→Czechia – Construction work for highways, roads – II/117 Strašice - Mirošov, 4. etapa
Tender$7.5MCloses 2026-08-12CZEConstructionSupply Chain Notice: WC1857725 - CY- CIDP26 - Tool Ref: 126596-(AK) Akrotiri Mole Steel Jetty - Entire Structure - Refurbish, CYPRUS
→WC1857725 - AKI- CIDP Tool Ref: 126596 (AK)-Akrotiri Mole Steel Jetty - Refurbish Entire Structure * Please provide a detailed description of the notice you are adding: Demolish existing steel jetty, complete with concrete beam along with the structures/ buildings south of the proposed new quay wall. Reconstruct new jetty using both precast units and in-situ concrete, complete with foundation, relief prism, drainage system, including oil water separator and equipped with fenders, bollards, handrails, ladders and M&E services (power & water supply) related to the Mole jetting as well as lighting installation for both new jetty and other Mole area and various reinstatement works of the affected surfaces (concrete & asphalt). The Provisional Key Tender dates for the project are as follows: - Expression of interest: 20/07/2026 - Expression of interest return: 27/07/2026 - Invitation to Tender: 06/08/2026 - Tender Return Date: 16/10/2026 - Contract award: 20/12/2027 - Commencement of work: 07/01/2027 - Completion of work: 30/08/2027 Note: Due to Environmental Issues Works within water are to be completed by 30 April 2027. The completion of the works will be on 30/08/2028, considering the turtle nesting period falls between April and November when no works are allowed underwater. The currency of this project is Euro (€). The location of this project is Cyprus (British Forces, RAF Akrotiri). Additional information: Work commencement and completion dates will be subject to MOD DIO's agreement, as they will be dictated by the DIO Environmental Advisor to avoid the environmental restricted periods (e.g. pre-determined breeding periods, turtle nesting period, etc.). This will lead to phasing of the works. ATTACHMENTS: 1. EOI (expression of interest) form 2. PQQ (pre-qualification questionnaire) form Both forms must be completed and returned by the interested tenderers
Tender$3.3MCloses in 5 daysGBConstructionFrance – Functional support – SALLE HYPOXIQUE DE REEDUCATION
→France – Functional support – SALLE HYPOXIQUE DE REEDUCATION
Tender$594KCloses 2026-09-15FRAHealth
Always confirm details on the official source before applying — see our methodology.