Germany – Research and development services and related consultancy services – FE 08.0283/2026/BCG - Einfluss verschiedener AKR-Prüfzementchargen auf die statistische Verteilung von Dehnungen im Schnellprüfverfahren mit verschiedenen Gesteinskörnun-gen
Germany – Research and development services and related consultancy services – FE 08.0283/2026/BCG - Einfluss verschiedener AKR-Prüfzementchargen auf die statistische Verteilung von Dehnungen im Schnellprüfverfahren mit verschiedenen Gesteinskörnun-gen
Want help applying?
Get matched with a grant or bid writer who can prepare this application. No obligation.
Related opportunities
See all alternatives →Clean Maritime Demonstration Competition 7: Deployment trials
→UK registered organisations can apply for a share of up to £121 million across the three strands of this competition for innovative clean maritime technologies. This funding is from the Department for Transport (DfT).
Grant$15.8MCloses 2026-07-15GBResearchClean Maritime Demonstration Competition 7: Pre-deployment trials
→UK registered organisations can apply for a share of up to £121 million across the three strands of this competition for innovative clean maritime technologies. This funding is from the Department for Transport (DfT).
Grant$6.3MCloses 2026-07-15GBResearchIndustrial Readiness for Affordable Ka-band User Terminals
→Expected Impact: Projects funded under this call are expected to deliver tangible industrial outputs that demonstrably advance the readiness and affordability of future governmental Ka-band user terminals for IRIS2 and GOVSATCOM services. Expected outputs include, for example: qualified production processes, calibrated sub-assemblies, pilot-run units, validated manufacturing equipment chains or manufacturing cost models. Purely analytical deliverables (studies, design reports) are not sufficient as primary outputs but may complement the above. Where relevant, outputs shall include documented design assumptions, interface parameters or process specifications enabling adaptation to different terminal configurations with limited re-engineering, so as to support uptake in follow-on integration, pilot deployment and scale-up activities. Objective: The aim of this call for proposals is to advance the industrial readiness of European Ka-band user terminal technologies, subsystems and manufacturing processes, with a view to enabling cost-effective production of user terminals for services provided under the Union secure connectivity programme (IRIS²) and GOVSATCOM. The target reference…
Grant$23.1MCloses 2026-08-26EUResearchGermany – Construction work for sports facilities – Brödermannsweg 2 - Sportboden
→Germany – Construction work for sports facilities – Brödermannsweg 2 - Sportboden
Tender$13.5MCloses 2026-07-09DEUConstructionEarly Independence: NERC Independent Research Fellowship 2026 (Fellowship)
→Apply for a Natural Environment Research Council (NERC) Independent Research Fellowship (IRF) to further your career through an independent research project. You must: • be an early career researcher • hold a PhD qualification (or equivalent experience) be based at a UK research organisation eligible for NERC funding
Grant$9.7MCloses in 3 daysGBResearchMicroelectronic – Front-End Module (FEM)
→Expected Outcome: The targeted outcomes reflect the above challenges and cover a comprehensive Front End module design which: Covers the FR3 range as defined by the relevant Agenda Item of WRC 27 (7 to 15 GHz range) with possible extension up to 24 GHz if required by some regional implementations, with inherent tuning capabilities to accommodate potential regional variations. Mitigates interferences with incumbent FR3 band users and maximises sharing capabilities across the band in line with the European regulatory approach on spectrum sharing. Enables integration of a large number of antenna elements beyond the State of the Art and support massive MIMO implementation with compensation of increased path loss compared to 5G FR1 implementations. Enables at least an order-of-magnitude increase in RF processing compared to 5G FR1 implementations. Enables 5G cell site reuse and minimises deployment complexity on top of 5G sites deployment. Enables low-cost and low energy implementation of the elementary constituent modules, efficient packaging and is mainly based on the integration of microelectronics heterogeneous technologies where European industry has strong expertise and…
Grant$16.2MCloses 2026-09-03EUResearch
Always confirm details on the official source before applying — see our methodology.