Alternatives to Portugal – Construction work for industrial buildings – Nova Area de Afinação – Empreitada
12 similar grants to Portugal – Construction work for industrial buildings – Nova Area de Afinação – Empreitada — matched by Construction · PRT.
Italy – Waste disposal site construction work – PROCEDURA DI GARA APERTA PER L’AFFIDAMENTO DI OPERE DI MESSA IN SICUREZZA DELLA DISCARICA DI CONTRADA ZUPPÀ NEL COMUNE DI MAZZARRÀ DI SANT’ANDREA (ME). CUP: G22H22000680006
→Italy – Waste disposal site construction work – PROCEDURA DI GARA APERTA PER L’AFFIDAMENTO DI OPERE DI MESSA IN SICUREZZA DELLA DISCARICA DI CONTRADA ZUPPÀ NEL COMUNE DI MAZZARRÀ DI SANT’ANDREA (ME). CUP: G22H22000680006
Tender$18.1MCloses 2026-09-21ITAConstructionItaly – Construction work for buildings relating to leisure, sports, culture, lodging and restaurants – Procedura aperta, sopra soglia comunitaria, per l'esecuzione dei lavori relativi all'intervento B10.3 "Riqualificazione della piazza ex-Mercato nel comune di Cortina d'Ampezzo (BL)" di cui all'Allegato 1 al d.P.C.M. dell'08.09.2023
→Italy – Construction work for buildings relating to leisure, sports, culture, lodging and restaurants – Procedura aperta, sopra soglia comunitaria, per l'esecuzione dei lavori relativi all'intervento B10.3 "Riqualificazione della piazza ex-Mercato nel comune di Cortina d'Ampezzo (BL)" di cui all'Allegato 1 al d.P.C.M. dell'08.09.2023
Tender$9.1MCloses in 7 daysITAConstructionBulgaria – Road construction works – “ИЗБОР НА ИЗПЪЛНИТЕЛ ЗА ПРОЕКТИРАНЕ, УПРАЖНЯВАНЕ НА АВТОРСКИ НАДЗОР И СТРОИТЕЛСТВО (ИНЖЕНЕРИНГ) ЗА ИЗГРАЖДАНЕ НА НОВ ПЪТ, ПРОДЪЛЖЕНИЕ НА ПЪТ PDV- 2340 „СЪЕДИНЕНИЕ - ГОЛЯМ ЧАРДАК – ЦАРИМИР – КАЛОЯНОВО“ ОТ КМ 8+000 ДО КМ 11+700 В ОТСЕЧКА С. ГОЛЯМ ЧАРДАК – С. ЦАРИМИР“
→Bulgaria – Road construction works – “ИЗБОР НА ИЗПЪЛНИТЕЛ ЗА ПРОЕКТИРАНЕ, УПРАЖНЯВАНЕ НА АВТОРСКИ НАДЗОР И СТРОИТЕЛСТВО (ИНЖЕНЕРИНГ) ЗА ИЗГРАЖДАНЕ НА НОВ ПЪТ, ПРОДЪЛЖЕНИЕ НА ПЪТ PDV- 2340 „СЪЕДИНЕНИЕ - ГОЛЯМ ЧАРДАК – ЦАРИМИР – КАЛОЯНОВО“ ОТ КМ 8+000 ДО КМ 11+700 В ОТСЕЧКА С. ГОЛЯМ ЧАРДАК – С. ЦАРИМИР“
Tender$12.6MCloses in 11 daysBGRConstructionSweden – Building completion work – Byggarbeten kulturhistoriskt bestånd
→Sweden – Building completion work – Byggarbeten kulturhistoriskt bestånd
Tender$10.5MCloses in 12 daysSWEConstructionItaly – Thermal insulation work – Accordo Quadro interventi di miglioramento sismico e riqualificazione energetica dell'edificio ARTE sito in Genova Via Tofane 92-98
→Italy – Thermal insulation work – Accordo Quadro interventi di miglioramento sismico e riqualificazione energetica dell'edificio ARTE sito in Genova Via Tofane 92-98
Tender$10.4MCloses 2026-09-28ITAConstructionCroatia – Works for complete or part construction and civil engineering work – IZGRADNJA III OŠ Čakovec
→Croatia – Works for complete or part construction and civil engineering work – IZGRADNJA III OŠ Čakovec
Tender$6.3MCloses 2026-09-29HRVConstructionFrance – Structural steel erection work for buildings – ACCORD CADRE MIXTE POUR LA CONSTRUCTION DE HANGARS PORTUAIRES SUR LES BASSINS EST ET OUEST DU GPMM
→France – Structural steel erection work for buildings – ACCORD CADRE MIXTE POUR LA CONSTRUCTION DE HANGARS PORTUAIRES SUR LES BASSINS EST ET OUEST DU GPMM
Tender$5.1MCloses todayFRAConstructionSpain – Resurfacing works – Construcción de vial de conexión de la BI-739 con la ronda del BEC en Barakaldo.
→Spain – Resurfacing works – Construcción de vial de conexión de la BI-739 con la ronda del BEC en Barakaldo.
Tender$8.1MCloses 2026-09-29ESPConstructionSpain – Construction, foundation and surface works for highways, roads – OC-SG-26002; 54.635/26 Rehabilitación superficial y estructural de firme. Carretera: N-603 PP.KK. 62+400 al 90+940. Localidades del tramo: El Espinar, Otero de Herreros, Ortigosa. Provincia de Segovia. 32-SG-3320
→Spain – Construction, foundation and surface works for highways, roads – OC-SG-26002; 54.635/26 Rehabilitación superficial y estructural de firme. Carretera: N-603 PP.KK. 62+400 al 90+940. Localidades del tramo: El Espinar, Otero de Herreros, Ortigosa. Provincia de Segovia. 32-SG-3320
Tender$7.7MCloses 2026-09-29ESPConstructionCA18389 - Leeds College of Building - Principal Contractor
→Leeds College of Building are looking for a Principal Contractor to undertake the design, construction, management and delivery of refurbishment works to the newly named CTEC Building, located on Byron Street, Leeds. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18389. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18389 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Tender$18.9MCloses 2026-09-21GBConstructionCroatia – Construction work for highways, roads – Izgradnja sektora Metković – Dubrovnik, poddionica Slano - PUO Mravinjac (L=11,5 km), autocesta A1 Zagreb-Split-Dubrovnik
→Croatia – Construction work for highways, roads – Izgradnja sektora Metković – Dubrovnik, poddionica Slano - PUO Mravinjac (L=11,5 km), autocesta A1 Zagreb-Split-Dubrovnik
Tender$255MCloses 2026-09-28HRVConstructionDNWP0073 - Lot 1B/In-SEP ID - Controlled Area Initial Decommissioning Operations
→The anticipated scope for DNWP0073 is indicatively only. The Contractor requires support to the Inside Controlled Area (In-SEP) Decommissioning Operations. This will take the form of the provision of resource, up to 30 Full Time Equivalent (FTE), with an appropriate ratio of blue:white collar resources to be determined by the Subcontractor to best meet the Initial Decommissioning (ID) activities required by the Contractor. A current contract is in place until 31st March 2027 to prove the concept and develop an initial operating capability. This EOI relates to the longer-term works anticipated to commence thereafter, with an estimated duration of 24 months. The tasks undertaken will be broad and varied, and will be located in existing In-SEP and any future In-SEP buildings. Broadly, the Subcontractor will be required to provide Operational Support to the ID capability, build upon the previously developed ID capability, drive future improvements and assist in building scope of ID workload. Specific work and details will be decided by the ID In-SEP, Delivery Board and locally on plant at Plant Operations Control Centres (POCCs). Initial works will include waste removal, waste packaging and despatch and size reduction. Deplanting, involving the removal, lifting, size reduction and transport of redundant plant will also be required. Works will grow and develop in complexity as the capability matures, subject to providing ongoing Value for Money. (VFM) Tasks which meet the definition of 'Construction' (CDM 2015 Part 1 Regulation 2) should now be anticipated and appropriate management and supervision arrangements incorporated. This Contract Opporutnity represents a long-term commitment by the Contractor to further develop the Suitably Qualified and Experienced Person (SQEP) workforce of the Subcontractor to undertake works in uniquely hazardous facilities requiring prior knowledge and experience. The Subcontractor will be responsible for the design of all temporary works, this is anticipated to primarily be access/scaffolding but may also include design of lifting plans. The Subcontractor will ensure a safe sequence is adhered to for all activities. This may require the use of Contractor's structural/mechanical engineer on an ad-hoc basis. The Subcontractor shall integrate and co-ordinate its design with the following design of the Contractor and Others. The Subcontractor shall submit all temporary works plans to the Project Manager for acceptance prior to erection. The Subcontractor will be responsible for ensuring an appropriate level of checking and approval for their designs. The review period for the Project Manager to review the Review Documents is up to 2 weeks (10 working days). No temporary works will be erected until the Review Documentation has been authorised by the Project Manager. Important: Delivery is within a live operational environment, and scope is subject to change. Additional information: https://www.linkedin.com/company/a2r-altrad-atkinsrealis-remediation https://www.gov.uk/government/news/sellafield-ltd-awards-high-hazard-risk-reduction-framework-contract
Tender$27.1MCloses in 14 daysGBConstruction