Supply Chain Notice: WC1680053 - DHK - Refurbish Kitchens and Bathrooms on SFAs (CYPRUS)
1. Remove and dispose of all existing kitchen units, floor finishes, and redundant service ducts associated with the existing kitchen installation. 2. Remove and dispose of existing electrical accessories, including surface-mounted PVC trunking, where affected by the proposed refurbishment works. 3. Supply, deliver, and install new kitchen units, including the provision and installation of new ceramic floor finishes. 4. Carry out all electrical works necessary to accommodate the proposed kitchen and bathroom layouts, including the installation of new wiring, accessories, and fittings as required. 5. Refurbish all toilet, shower, and bathroom areas by removing and disposing of existing floor finishes, wall tiles, sanitary fittings, fixtures, and accessories. 6. Reconfigure and relocate sanitary fixtures within the bathroom areas in accordance with the approved layout. 7. Supply and install new drainage pipework and associated fittings to suit the revised locations of sanitary fixtures. 8. Supply, install, and commission new sanitary fittings, fixtures, and accessories. 9. Supply and lay new ceramic floor and wall tiles, including all necessary preparation, bedding, grouting, and finishing works. 10. Carry out all plumbing works required for the complete installation, connection, testing, and commissioning of the sanitary systems. 11. Supply and install thermostatic mixing valves to all shower and bathroom fittings where specified. Access to HSW areas have several restrictions that should be complied with as follows: - All persons entering these areas should have a valid security pass. Such pass can only be provided to Greek Cypriots, Turkish Cypriots or UK nationals. - Persons working on site will be escorted throughout the duration of the project - No mobile phones or other electronic devices will be permitted on site during the works. The Provisional Key Tender dates for the project are as follows: - Expression of interest: 15/06/2026 - Expression of interest return: 26/06/2026 - Invitation to Tender: 27/07/2026 - Tender Return Date: 18/09/2026 - Contract award: 04/01/2027 - Commencement of work: 18/01/2027 - Completion of work: 30/04/2027 The currency of this project is Euro (€). The location of this project is Cyprus (British Forces, Dhekelia). Additional information: 1. EOI (expression of interest) form 2. PQQ (pre-qualification questionnaire) form The forms must be completed and returned by the interested tenderers Additional text: Work commencement and completion dates will be subject to MOD DIO's agreement, as they will be dictated by the Operating Authority to avoid Operational Restrictions
Want help applying?
Get matched with a grant or bid writer who can prepare this application. No obligation.
Related opportunities
See all alternatives →More grants — Construction · GB
CA18082 - WHC - Barnfield College Phase 3, including landscaping works
→West Herts College are completing their site wide masterplan at the Barnfield Campus and are looking to Deliver the final Phase of the masterplan. Phase 3 will deliver a new court sports hall, changing facilities, social and gym spaces and teaching spaces on both the ground and first floor including associated external works and drainage. Phase 3 - The proposal is for a two-storey Concrete/ Steel frame. The facility will deliver a four-court sports hall and associated changing rooms. Teaching areas on both the ground and first floor with social spaces. There will be two dedicated entrances for either the teaching or sports. The building will be connected to the existing M&E infrastructure where required. Works are to also include a feature fencing linking Phase 2 and 3 and associated external works/ drainage The approximate GIFA is is 2,587m². To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18082. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18082 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Tender$21.2MCloses 2026-07-22GBConstructionBBV HS2 MWCC North - Architectural Construction Works - Buildings
→Balfour Beatty VINCI (BBV) have been awarded HS2 main works civils contracts for the Area North project in the West Midlands. We are looking to engage with an experienced contractors who can deliver Architectural Construction Works. There will be multiple work packages which will encompass a range of construction and finishing elements, all on a supply and install basis. These include roofing systems; external cladding works; steel gantries; secondary steelwork (including handrails, grating, walkways, metal stairs, balustrades, and ladders); blockwork, wind posts, and lintels; architectural decoration works such as flooring, screeding, painting and decorating, tiling, and signage; metal doors, grilles and louvres; internal linings, ceilings, and Durasteel partition systems. Full details and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of works, prior to completing this expression of interest (EOI).
Tender$6.6MCloses in 4 daysGBConstructionEuston Scissor Box Precast Roof Panels
→The supplier will be responsible for the manufacture, fabrication and supply of the precast roof panels for Euston Scissor Box, the supplier will also be required to carry out the stage 5 design including fabrication and shop drawings. The supplier will also be responsible for the temporary works scheme.
Tender$3.4MCloses todayGBConstructionBuilding Rewire Projects
→This tender is for the rewire of buildings within Portsmouth Naval Base. Interested suppliers must have experience of large scale building rewires and be able to demonstrate 3 examples in order to progress to the next stage of the tender process.
Tender$1.3MCloses in 11 daysGBConstructionCA18034 - Tameside College - Contractor for Portal Framed Building
→Tameside College require a contractor for the design, supply, and construction of a new Construction Skills Hub building within the Tameside College campus. The proposed building benefits from planning approval under permitted development. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18034. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18034 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Tender$992KCloses in 8 daysGBConstructionEKFB JV - Precast Concrete UTX (Under Track Crossing) chambers system and adjoining duct works
→NC2A is the North Chilterns to Aylesbury section of C23, a part of the HS2 project managed by the EKFB Joint Venture. We are seeking a specialist subcontractor to undertake the following works within the NC2A section: The Subcontract Works include the provision of all management, labour, materials, plant and equipment, supervision, and other resources necessary and ancillary to safely and correctly complete the installation and handover of Precast Concrete UTX (Under Track Crossing) chamber system and adjoining ducts , as described in the specifications, drawings, HS2 standards Requirements and local authority specifications. The UTX system comprises segmented precast concrete chambers with precast concrete covers, seated on a precast concrete base. The precast chambers and covers shall be supplied and delivered to site by the Contractor for installation by the Subcontractor. Contractor will Undertake excavation works to the UTX duct formation level, subcontractor will complete excavation for installation of UTX Chambers and ducts. The Subcontract works include, but are not limited to: Dewatering of excavations as required. Provision of edge protection to ensure that excavation is safe for works Protection of all existing assets Setting out the UTX in accordance with the design and specifications, using primary control points provided by the Contractor. Transfer UTX Chambers from Laydown Area to point of installation Installation of the UTX system comprising segmented precast concrete chambers using methodology provided in detailed design Install all units onto the precast concrete base slabs provided by the Contractor. Install the full precast assembly, including the Precast concrete chamber segments and Precast concrete covers Install all components in accordance with the approved drawings, specified line and level, and manufacturer's instructions. Supply and install all associated ducting, ensuring compliance with project specifications and drawings. As part of installation, CBGM / Cast in situ concrete - minimum FND4 concrete around UTX and ducts to be done by Subcontractor Testing and handover
Tender$661KCloses in 5 daysGBConstruction
Always confirm details on the official source before applying — see our methodology.