CA18408 - Mental Health Emergency Department (MH ED)
Tender to undertake building works to remodel existing estate to provide a new Mental Health ED department. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18408. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18408 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Don't miss the next one like this
New construction grants in GB open all the time. Get a free weekly email with only the ones that match — nothing else.
Want help winning this?
Enter your email and we'll send the official application link, deadlines and pointers right away — free. Want a hand? Tick the box and we'll introduce you to a vetted grant or bid writer. The intro's free, and you only pay if you choose to work with them.
Related opportunities
See all alternatives →More grants — Construction · GB
DNWP0073 - Lot 1B/In-SEP ID - Controlled Area Initial Decommissioning Operations
→The anticipated scope for DNWP0073 is indicatively only. The Contractor requires support to the Inside Controlled Area (In-SEP) Decommissioning Operations. This will take the form of the provision of resource, up to 30 Full Time Equivalent (FTE), with an appropriate ratio of blue:white collar resources to be determined by the Subcontractor to best meet the Initial Decommissioning (ID) activities required by the Contractor. A current contract is in place until 31st March 2027 to prove the concept and develop an initial operating capability. This EOI relates to the longer-term works anticipated to commence thereafter, with an estimated duration of 24 months. The tasks undertaken will be broad and varied, and will be located in existing In-SEP and any future In-SEP buildings. Broadly, the Subcontractor will be required to provide Operational Support to the ID capability, build upon the previously developed ID capability, drive future improvements and assist in building scope of ID workload. Specific work and details will be decided by the ID In-SEP, Delivery Board and locally on plant at Plant Operations Control Centres (POCCs). Initial works will include waste removal, waste packaging and despatch and size reduction. Deplanting, involving the removal, lifting, size reduction and transport of redundant plant will also be required. Works will grow and develop in complexity as the capability matures, subject to providing ongoing Value for Money. (VFM) Tasks which meet the definition of 'Construction' (CDM 2015 Part 1 Regulation 2) should now be anticipated and appropriate management and supervision arrangements incorporated. This Contract Opporutnity represents a long-term commitment by the Contractor to further develop the Suitably Qualified and Experienced Person (SQEP) workforce of the Subcontractor to undertake works in uniquely hazardous facilities requiring prior knowledge and experience. The Subcontractor will be responsible for the design of all temporary works, this is anticipated to primarily be access/scaffolding but may also include design of lifting plans. The Subcontractor will ensure a safe sequence is adhered to for all activities. This may require the use of Contractor's structural/mechanical engineer on an ad-hoc basis. The Subcontractor shall integrate and co-ordinate its design with the following design of the Contractor and Others. The Subcontractor shall submit all temporary works plans to the Project Manager for acceptance prior to erection. The Subcontractor will be responsible for ensuring an appropriate level of checking and approval for their designs. The review period for the Project Manager to review the Review Documents is up to 2 weeks (10 working days). No temporary works will be erected until the Review Documentation has been authorised by the Project Manager. Important: Delivery is within a live operational environment, and scope is subject to change. Additional information: https://www.linkedin.com/company/a2r-altrad-atkinsrealis-remediation https://www.gov.uk/government/news/sellafield-ltd-awards-high-hazard-risk-reduction-framework-contract
Tender$27MCloses in 13 daysGBConstructionCA18389 - Leeds College of Building - Principal Contractor
→Leeds College of Building are looking for a Principal Contractor to undertake the design, construction, management and delivery of refurbishment works to the newly named CTEC Building, located on Byron Street, Leeds. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18389. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18389 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Tender$18.9MCloses 2026-09-21GBConstructionBarrow Centre, Mount Edgcumbe - Fire Repair Works
→TENDER DOCS AVAILABLE AT: https://procontract.due-north.com/Advert?advertId=f8e433d6-0090-f111-813c-005056b64545 The project concerns the refurbishment of the Mount Edgcumbe Barrow Centre following damage sustained to the accommodation block by a fire on the afternoon of 04 February 2025. The primary objective of the project is to re-establish the commercial operations of the fire damaged parts of the Barrow Centre whilst giving due consideration to its surroundings, heritage and constraints. The Barrow Centre comprises the historic service yard and associated buildings for the Mount Edgcumbe Estate, now utilised as a visitors centre for the modern park and gardens. The central U-shaped stable block consists of a two and three storey mixed-use building containing a cafe, shops, workers flats and 2 holiday lets. The fire damaged section of the property forming the focus of this project consists of the split level northern wing containing 2 holiday cottages, Yew Tree Cottage and Horseshoe Cottage, and 2 workers flats, numbers 3 and 6 which in total provided 8 no. bedrooms. The Mount Edgcumbe House and Country Park is jointly owned by Cornwall Council (CC) and Plymouth City Council (PCC). PCC are the insurance policyholders for the Park and remain the beneficiaries for any sums paid out under the insurance claim. An agreement between PCC and CC is that CC will progress the refurbishment works
Tender$1.5MCloses in 7 daysGBConstructionBLD-3163 Store 54 Independent Heating Solution - Delivery
→High level summary of the project includes: Undertaken roof repair as there are leaks throughout. Installation of roof insulation and suspended ceiling. Upgrade of all glazing and doors (including fire doors). Strip out of existing M&E services/plant. Installation of VRV/VRF system and ASHP. Upgrade of all lighting and ensuring complete electrical installation is ATEX/DSEAR compliant. Note, a Stage 3 design and report will be provided and we would expect a stage 4 design/report before we progress with the build stage.
Tender$1.4MCloses in 11 daysGBConstructionCA18370 - ITT 52/2026 - Bessbrook Community Centre - New Mini Digi Hub
→A project supported by PEACEPLUS, a programme managed by the Special EU Programmes Body (SEUPB) . Competent Contracting companies are hereby invited to tender to deliver Bessbrook Community Centre Upgrade and Refurbishment Works. Extension and various internal Works required as part of the creation of a community Digihub. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18370. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18370 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Tender$719KCloses in 13 daysGBConstructionSt Mary the Virgin, Great Dunmow | Main Contractor for Internal Reordering Project
→St Mary the Virgin, Great Dunmow, is seeking tenders for a main contractor to deliver their National Lottery Heritage Fund project which involves a series of internal alterations to the historic church building. The scope of work includes: - Relocation of the font - Construction of internal partitions and supply and installation of accessible WC - Supply and installation of various bespoke joinery elements, including: storage cupboards, ramps, AV desk, raised platform, kitchenette etc. - Supply and installation of new floor construction and underfloor heating system at the west end - Lowering of the south porch internal floor level and associated remedial works - Construction of new mezzanine to the tower - Construction of new internal porch - Supply and construction of new external doors - New services and redecoration to works areas If you are intersted in receving the suite of tender documents for this opportunity, please contact john.bailey@thomasford.co.uk
Tender$675KCloses todayGBConstruction
People also viewed
Other grants visitors looked at from Avon and Wiltshire Mental Health Partnership NHS trust.
CA18336 - CAMHs Tier 4 Beds and associated services
→The Trust is looking to appoint a supplier to provide CAMHs Tier 4 bed and associated services in the BNSSG area. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18336. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18336 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Tender$2.7MCloses in 3 daysGBHealthDecode the Immunoscience of age-related diseases
→Expected Impact: The action under this topic is expected to achieve the following impacts: Accelerate EU access to more cost-effective interventions in an increasingly ageing population by identifying personalised treatment approaches for elderly-onset immune diseases. Decrease disease risk later in life by defining specific prevention strategies based on ageing biomarkers and risk factors. Halt age-associated disease exacerbation by the identification of predictive and digital biomarkers that can stratify patients for early intervention. Improve quality of life for healthy individuals and patients by preventing further health decline, avoiding escalating care costs, and properly stratifying individuals earlier in the diagnostic pathway. Accelerate adoption of innovative diagnostic, preventative, and therapeutic strategies, strengthening the EU’s position as a healthcare innovator. Evaluate digital biomarker as potential regulatory endpoints in the ultimate goal to develop medicines for ‘healthy ageing’. Integrate fragmented research efforts by bringing together health industry sectors and stakeholders to develop clinical and multi-omics data integration capabilities. Enable new…
Grant$10.7MCloses 2026-10-08EUHealthLarge-Scale Photonic Quantum Computing Platform Technologies
→Expected Outcome: This action will establish a strategic European initiative to develop scalable, modular, and interoperable photonic quantum computing platforms. Proposals for this topic are expected to address and provide credible solutions to at least two major technical roadblocks currently limiting the advancement of photonic quantum computing such as: The lack of deterministic, high-efficiency photonic entanglement and loss-tolerant architectures suitable for fault-tolerant scaling The absence of a standardised, integrated control stack combining photonic hardware, firmware, and system software with reliable benchmarking across platforms Project results are expected to contribute to the following expected outcomes: By 2028, demonstration of a photonic NISQ processor with ≥100 photonic qubits, integrating deterministic single-photon sources, low-loss waveguides, on-chip detectors, and a firmware stack (scheduler, controller, compiler), validated via hardware-agnostic benchmarks and hybrid photonic-HPC applications demonstrating classical-quantum crossover By 2030, delivery of a full-stack, high-connectivity photonic quantum computer, with modular scalability, integrated…
Grant$11.6MCloses 2026-09-30EUResearchFlagship-pilot: large-scale demonstrations of CCAM (CCAM Partnership)
→Expected Outcome: This flagship pilot is the culmination of the entire activity catalogue carried out by the CCAM Partnership since its launch in 2021. It will combine in one project the most promising CCAM use-cases across three key domains, with the technological advancements from all its R&I clusters [1] supporting and enabling CCAM systems and services towards market uptake. This action is expected to contribute to all the following outcomes: Large-scale demonstrations of inclusive, user-oriented, and well-integrated CCAM systems and services for people and goods in mixed traffic through Field Operational Tests (FOTs), Technology Pilots, and Living Labs, building upon advanced and emerging SAE Level 2 systems to move towards SAE Level 3 and 4 functionalities, at multiple test sites and corridors showcasing CCAM potential [2] , for a minimum of 12 months. Validation of enabling technologies that facilitate the extension of Operational Design Domains (ODDs) in large-scale operations and enhance perception performance under poor lighting and adverse weather conditions in large-scale demonstrations and pilots. Assessment of deployment readiness and demonstration of technological…
Grant$115.7MCloses 2026-10-08EUResearch
Always confirm details on the official source before applying — see our methodology.