DNWP0027- Lot 1B / WAGR B55 Demolition - Sellafield - A2R JV
The B55 and B55.2 demolition project at Sellafield involves the controlled demolition and dismantling of the B55 Office Complex and B55.2 Turbine Hall, located within the WAGR complex, down to existing ground-floor slab level. The scope includes soft stripping, asbestos remediation, high-reach mechanical demolition of the structural frame, cladding and reinforced-concrete floors, together with segregation and processing of demolition arisings, backfilling of voids and final site clearance. A key constraint is Substation 65, which is located within the B55/B55.2 structure and must remain operational and be protected from demolition impacts, dust and water ingress throughout the works. Retained basements and associated structures also require protection, while uncertainties associated with ageing structures, buried services, below-ground voids and incomplete historical information must be managed through robust surveys, demolition engineering and risk-informed planning. Overall, the project is intended to provide a safe, demolition-led solution that reduces workforce exposure, removes redundant infrastructure and supports accelerated hazard reduction across the wider WAGR decommissioning programme. Additional information: https://www.linkedin.com/company/a2r-altrad-atkinsrealis-remediation https://www.gov.uk/government/news/sellafield-ltd-awards-high-hazard-risk-reduction-framework-contract
Don't miss the next one like this
New construction grants in GB open all the time. Get a free weekly email with only the ones that match — nothing else.
Want help winning this?
Enter your email and we'll send the official application link, deadlines and pointers right away — free. Want a hand? Tick the box and we'll introduce you to a vetted grant or bid writer. The intro's free, and you only pay if you choose to work with them.
Related opportunities
See all alternatives →More grants — Construction · GB
A66 Northern Trans Pennine Project(NTP) - Carleton Underpass Structure (Precast Concrete Beams)
→Kier Infrastructure intends to engage experienced and qualified bridge installation contractors for the erection of Carleton Underpass on Scheme 2 of the A66 Northern Transpennine Project. The scope is for the installation of pre-cast concrete beams and the ancillary works. The A66 upgrade will see single-lane sections of the 80km stretch between the M6 and the A1 made into dual carriageway, while key junctions will be improved. The A66 project is to be delivered in collaboration by three Tier 1 contractors, Balfour Beatty, Kier and Keltbray. The A66 project is to be delivered in collaboration by three Tier 1 contractors, Balfour Beatty, Kier and Keltbray. We will use the Build UK Common Assessment Criteria (CAS) to ensure a consistent minimum business competence. If your company possesses necessary qualifications and is interested in bidding for this project, please email infrastructure.procurement@kier.co.uk with your company's portfolio, relevant experience, and references for further evaluation.
Tender$13.3MCloses in 9 daysGBConstructionDNWP0016 - WAGR Enabling Works and Strip-out - Sellafield - A2R JV
→WAGR Overview and Site Information The Windscale Advanced Gas-cooled Reactor (WAGR), commissioned in 1962, was the prototype for the UK's second-generation Advanced Gas-cooled Reactor (AGR) fleet. The facility (Building B50), recognised by its distinctive spherical containment shell, was supported by the fuel assembly building (B52) and turbine hall (B55). Following reactor core dismantling and removal in 2012, the WAGR Complex entered Care and Maintenance (C&M). The facility is now progressing towards its final phase of decommissioning and demolition. Existing records confirm the presence of Low-Level Waste (LLW) and Intermediate-Level Waste (ILW), resulting in ongoing radiological and contamination hazards. All buildings within the WAGR area are owned by the Remediation operating unit, remain under active surveillance and maintenance, and are classified as Beta Gamma contamination facilities. Project Scope The scope comprises enabling, strip-out, waste management and decommissioning support activities across the WAGR facility, alongside support for wider Windscale decommissioning programmes and emergent operational requirements. Key activities include (see attachment) - Strip-out Works: Internal and external removal of fixtures, fittings, equipment and non-structural elements to facilitate future decommissioning and demolition activities. - Radiological Waste Management: Safe handling, removal and management of LLW and ILW in accordance with site requirements. - Asset Reinstatement: Delivery of asset reinstatement works and provision of SQEP resources to support successful handover. - Pre-Construction Information (PCI): Support information gathering and site characterisation where existing PCI is insufficient. - Surveys: Plan and undertake surveys to assess radiological, hazardous and operational conditions in support of future decommissioning works. - Project Enabling Works: Design, fabricate, trial and implement enabling solutions, equipment and materials to support project delivery. - Asbestos Management: Planning, sampling, monitoring and licensed asbestos removal where required. - Procurement: Procurement of materials, equipment and associated quality documentation. - Waste Management: Sorting, segregation, consolidation and disposal of current and historical wastes, including completion of documentation for transfer to Sellafield Waste Coordinators. - Emergent Works: Rapid response support to operations and maintenance teams for safety-critical issues. - Temporary Works: Management, design and construction of temporary works, including scaffolding, enclosures and other supporting structures. - Decontamination: Decontamination activities to support area declassification and radiological rollback. - Plant Modifications: Production of Plant Modification Proposals (PMPs) and associated documentation. - Scaffolding Services: Provision of scaffolding design, supply and installation resources as required. Additional information: https://www.linkedin.com/company/a2r-altrad-atkinsrealis-remediation https://www.gov.uk/government/news/sellafield-ltd-awards-high-hazard-risk-reduction-framework-contract
Tender$26.7MCloses in 7 daysGBConstructionCA18487 - DN Colleges Group - North Lindsey College - ITT for Global House Reclad and Refurbishment Project
→This document is an invitation to tender (ITT) for the design and construction of the proposed recladding and refurbishment works to Global House, an existing DN Colleges facility within their North Lindsey Campus. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18487. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18487 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Tender$4.6MCloses in 3 daysGBConstructionRooftop Solar PV O&M Framework 2027
→WSCC require a contractor to carry out reactive call-out visits, a contractor to undertake all inspections, a supplier undertake planned repairs and maintenance of rooftop mounted solar PV systems and Supplier to undertake planned repairs and maintenance of its domestic systems on applicable sites. This is a 4 year multi supplier framework.
Tender$3.4MCloses 2026-11-13GBConstructionBBV HS2 MWCC North - Pumped Drainage
→Balfour Beatty VINCI (BBV) have been awarded HS2 main works civils contracts for the Area North project in the West Midlands. We are looking to engage with an experienced contractor supply chain who provide Pumped Drainage works. Full details and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of works, prior to completing this expression of interest (EOI).
Tender$6.7MCloses in 1 dayGBConstructionCCHA Fire Door Replacement Project 26/27
→Castles and Coasts Housing Association (CCHA) wishes to procure the services of a competent contractor to undertake the renewal of 350nr. fire doors across twenty-four of their general needs housing blocks as part of their planned compliance programme. All of the schemes are located in the Cumbria region, covering Cockermouth, Crosby Villa, Flimby, Keswick, Maryport, Papcastle, Wigton & Workington
Tender$1.2MCloses 2026-11-20GBConstruction
People also viewed
Other grants visitors looked at from Altrad AtkinsRealis Joint Venture (A2R JV).
Great British Energy (GBE) Supply Chain Fund: Offshore Wind and Networks
→The Great British Energy (GBE) Supply Chain Fund: Offshore Wind and Networks will award up to £300 million in capital grant funding to build UK manufacturing capacity for key constrained components in offshore wind and enabling electricity networks sectors. Funding must be used to construct new or extend existing manufacturing facilities in the UK. The application window will close 10 December 2026 (or earlier if the Fund's budget is fully allocated).
Grant$400.4MCloses 2026-12-10GBEnergySilicon Carbide Cladding Lead Test Rod Development-Phase 1
→Silicon Carbide Cladding Lead Test Rod Development-Phase 1Research, development, and fabrication of Silicon Carbide cladding specimens for research reactor insertion, irradiation, and post-irradiation examinations by 2030. The objective of this program is to advance the scientific and technological maturity of silicon carbide cladding for nuclear fuel rods for future use in commercial light water reactors.
Grant$62.5MCloses 2026-12-07USEnergyAdditional activities for the European Partnership of Agriculture of Data
→Expected Outcome: The successful proposal is expected to further contribute to the expected outcomes specified in topic HORIZON-CL6-2024-GOVERNANCE-02-01: European Partnership of Agriculture of Data, for continuation of the activities in line with already agreed outcomes. Scope: The objective of this action is to continue to provide support to the European partnership of Agriculture of Data identified in the Horizon Europe Strategic Plan 2021-2024 and first implemented under the topic HORIZON-CL6-2024-GOVERNANCE-02-01: European Partnership of Agriculture of Data, and in particular to fund additional activities (which may also be undertaken by additional partners) in view of its intended scope and duration, and in accordance with Article 24(2) of the Horizon Europe Regulation. The consortium which applied to and received funding under HORIZON-CL6-2024-GOVERNANCE-02-01: European Partnership of Agriculture of Data is uniquely placed to submit a proposal to continue the envisioned partnership. Not only did this consortium submit the proposal leading to the identification of the partnership in the Horizon Europe strategic planning 2021-2024, it has also been implementing the…
Grant$67.1MCloses 2026-11-26EUAgriculture & FoodNeutral-Atom Platform Technologies
→Expected Outcome: This action aims to establish European leadership in neutral-atom quantum simulation and digital quantum computing by delivering: Fully programmable industry-ready quantum simulators based on 10.000 neutral atoms in a scalable architecture, accessible via cloud platforms, and with the possibility of integrating them into high-performance computing environments. Fully programmable platform for neutral-atom quantum computing capable of both analogue quantum operations and gate-based computing with 1.000 physical qubits and a clear path to further scalability to 10.000 physical qubits. Coherence time of the order of hundreds of interaction times and infidelity of operations below 1%. Demonstration of quantum simulation and/or computing operating beyond classical computability, validated through benchmarking with classical methods. New real-world applications across science and industry (at least two) (e.g: in the energy and health sectors) The software stack for these applications, including enhanced software for verification, algorithm implementation, and user programming interfaces. Demonstration of the full quantum stack – including quantum control, electronic…
Grant$22.4MCloses 2026-11-17EUHealth
Always confirm details on the official source before applying — see our methodology.