Manchester International Airport - Demolition Works
"The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: -Installation, maintenance and removal of rail track protection. -Structural enabling and demolition works to an existing bridge structure. -Removal and disposal of road and pavement surfacing, kerbs, ducts and associated materials. -Careful removal and storage of existing coping stones and pilaster caps for potential reuse. -Demolition of existing parapets, pilasters, precast beams, cill beams and south abutment concrete. -Demolition and disposal of bridge structural elements in accordance with project requirements. -Working within a rail environment with compliance to all relevant safety and possession requirements."
Don't miss the next one like this
New construction grants in GB open all the time. Get a free weekly email with only the ones that match — nothing else.
Want help winning this?
Enter your email and we'll send the official application link, deadlines and pointers right away — free. Want a hand? Tick the box and we'll introduce you to a vetted grant or bid writer. The intro's free, and you only pay if you choose to work with them.
Related opportunities
See all alternatives →More grants — Construction · GB
DNWP0073 - Lot 1B/In-SEP ID - Controlled Area Initial Decommissioning Operations
→The anticipated scope for DNWP0073 is indicatively only. The Contractor requires support to the Inside Controlled Area (In-SEP) Decommissioning Operations. This will take the form of the provision of resource, up to 30 Full Time Equivalent (FTE), with an appropriate ratio of blue:white collar resources to be determined by the Subcontractor to best meet the Initial Decommissioning (ID) activities required by the Contractor. A current contract is in place until 31st March 2027 to prove the concept and develop an initial operating capability. This EOI relates to the longer-term works anticipated to commence thereafter, with an estimated duration of 24 months. The tasks undertaken will be broad and varied, and will be located in existing In-SEP and any future In-SEP buildings. Broadly, the Subcontractor will be required to provide Operational Support to the ID capability, build upon the previously developed ID capability, drive future improvements and assist in building scope of ID workload. Specific work and details will be decided by the ID In-SEP, Delivery Board and locally on plant at Plant Operations Control Centres (POCCs). Initial works will include waste removal, waste packaging and despatch and size reduction. Deplanting, involving the removal, lifting, size reduction and transport of redundant plant will also be required. Works will grow and develop in complexity as the capability matures, subject to providing ongoing Value for Money. (VFM) Tasks which meet the definition of 'Construction' (CDM 2015 Part 1 Regulation 2) should now be anticipated and appropriate management and supervision arrangements incorporated. This Contract Opporutnity represents a long-term commitment by the Contractor to further develop the Suitably Qualified and Experienced Person (SQEP) workforce of the Subcontractor to undertake works in uniquely hazardous facilities requiring prior knowledge and experience. The Subcontractor will be responsible for the design of all temporary works, this is anticipated to primarily be access/scaffolding but may also include design of lifting plans. The Subcontractor will ensure a safe sequence is adhered to for all activities. This may require the use of Contractor's structural/mechanical engineer on an ad-hoc basis. The Subcontractor shall integrate and co-ordinate its design with the following design of the Contractor and Others. The Subcontractor shall submit all temporary works plans to the Project Manager for acceptance prior to erection. The Subcontractor will be responsible for ensuring an appropriate level of checking and approval for their designs. The review period for the Project Manager to review the Review Documents is up to 2 weeks (10 working days). No temporary works will be erected until the Review Documentation has been authorised by the Project Manager. Important: Delivery is within a live operational environment, and scope is subject to change. Additional information: https://www.linkedin.com/company/a2r-altrad-atkinsrealis-remediation https://www.gov.uk/government/news/sellafield-ltd-awards-high-hazard-risk-reduction-framework-contract
Tender$27.2MCloses 2026-09-17GBConstructionCA18389 - Leeds College of Building - Principal Contractor
→Leeds College of Building are looking for a Principal Contractor to undertake the design, construction, management and delivery of refurbishment works to the newly named CTEC Building, located on Byron Street, Leeds. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18389. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18389 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Tender$19MCloses 2026-09-21GBConstructionSUPPLY CHAIN NOTICE - WC1996742- NDT TESTING OF PSD TANKS T3 & T6, AKROTIRI, CYPRUS
→The work described below will be undertaken for the two tanks one at a time: - Out of service inspection, including non-destructive examination and testing, grit blasting and recoating of the tank bottom and part of the shell plates - The rectification of any repairs identified following the NDT testing Location: Akrotiri Petroleum Supply Depot (PSD), CYPRUS The Provisional Key Tender dates for the project are as follows: - Expression of interest: 10/08/2026 - Expression of interest return: 31/08/2026 - Invitation to Tender: 07/09/2026 - Tender Return Date: 12/10/2026 - Contract award: 04/01/2027 - Commencement of work: 07/01/2027 - Completion of work: 19/07/2027 The currency of this project is Euro (€). The location of this project is Akrotiri, Cyprus (British Forces). Additional information: Any company wishing to participate in this tender should complete the Pre-Qualification Questionnaire (PQQ) and the EOI form which are attached and return them electronically to the above email address by no later than 12:00 EET on 31/08/2026. For companies that have submitted a PQQ within the last 12 months, there is no requirement to re-submit it. They must provide the details of their last PQQ submission to guarantee inclusion on the invitation list.
Tender$81.2MCloses in 3 daysGBConstructionBarrow Centre, Mount Edgcumbe - Fire Repair Works
→TENDER DOCS AVAILABLE AT: https://procontract.due-north.com/Advert?advertId=f8e433d6-0090-f111-813c-005056b64545 The project concerns the refurbishment of the Mount Edgcumbe Barrow Centre following damage sustained to the accommodation block by a fire on the afternoon of 04 February 2025. The primary objective of the project is to re-establish the commercial operations of the fire damaged parts of the Barrow Centre whilst giving due consideration to its surroundings, heritage and constraints. The Barrow Centre comprises the historic service yard and associated buildings for the Mount Edgcumbe Estate, now utilised as a visitors centre for the modern park and gardens. The central U-shaped stable block consists of a two and three storey mixed-use building containing a cafe, shops, workers flats and 2 holiday lets. The fire damaged section of the property forming the focus of this project consists of the split level northern wing containing 2 holiday cottages, Yew Tree Cottage and Horseshoe Cottage, and 2 workers flats, numbers 3 and 6 which in total provided 8 no. bedrooms. The Mount Edgcumbe House and Country Park is jointly owned by Cornwall Council (CC) and Plymouth City Council (PCC). PCC are the insurance policyholders for the Park and remain the beneficiaries for any sums paid out under the insurance claim. An agreement between PCC and CC is that CC will progress the refurbishment works
Tender$1.5MCloses in 14 daysGBConstructionManchester International Airport - Permanent Way Works
→The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: - Track renewals and modifications. - Plain line track installation. - S&C installation and modifications (where applicable). - Ballast excavation, placement and regulation. - Stressing, welding and rail adjustments. - Tamping and dynamic track stabilisation. - Possession planning and delivery support. - Associated rail plant and labour resources. - Testing, handback and assurance documentation.
Tender$3.4MCloses todayGBConstructionBLD-3163 Store 54 Independent Heating Solution - Delivery
→High level summary of the project includes: Undertaken roof repair as there are leaks throughout. Installation of roof insulation and suspended ceiling. Upgrade of all glazing and doors (including fire doors). Strip out of existing M&E services/plant. Installation of VRV/VRF system and ASHP. Upgrade of all lighting and ensuring complete electrical installation is ATEX/DSEAR compliant. Note, a Stage 3 design and report will be provided and we would expect a stage 4 design/report before we progress with the build stage.
Tender$1.4MCloses 2026-09-15GBConstruction
People also viewed
Other grants visitors looked at from Kier Transportation - CP7 NWC.
BJA FY 2026 Daniel Anderl Judicial Security and Privacy Program
→This is a notice of funding opportunity (NOFO) for the BJA FY 2026 Daniel Anderl Judicial Security and Privacy Program. This opportunity supports states and units of local government, including tribal governments that perform law enforcement functions, in creating and expanding efforts to protect the safety and security of federal judges by preventing the release of covered information about at-risk individuals and their immediate family members to ensure federal judges are able to administer justice fairly without fear of personal reprisal from individuals affected by the decisions they make in the course of carrying out their public duties. Many federal judges' personal information resides in state and local government records, databases, and registries that are publicly accessible and searchable and outside federal control. Grants to state and local entities support federal-state-local partnerships to protect federal judicial officers and their families. Funds awarded under this grant program must be used exclusively for protecting federal judges and their immediate family members as defined in statute. Applicants that have existing judicial protection programs should clearly delineate how grant funds will be used solely for federal judges and describe cost allocation methodologies to ensure appropriate separation of expenses. Expenses that also benefit other judges are acceptable, provided that any costs specific to state, local, or tribal judges are separately tracked and are not charged to this grant.
Grant$500KCloses 2026-10-15USProfessional ServicesIn Vivo High-Resolution Imaging for Inner Ear Visualization (R01 Clinical Trial optional)
→This funding opportunity aims to support the development of in vivo high-resolution structural and functional imaging technologies for the living human inner ear. Proposed projects should focus on improving the resolution of current imaging techniques or developing new imaging techniques that can visualize inner ear structures in vivo with significantly greater detail and accuracy than currently possible. Both structural and functional aspects, including visualizing dynamic elements are important to development of new and improved techniques. Projects may also focus on developing new imaging probes or contrast agents that can enhance visualization of the inner ear structures. Ultimately, research supported in response to this RFA is to encourage technologies that allow, for example, structures such as hair cells, otoliths, membranes, ions, and vasculature to be viewed in detail in awake patients in a clinical setting using non-invasive techniques. To achieve this goal, a multi-disciplinary team approach that takes advantage of the expertise of each team member is highly encouraged. Studies in humans and intermediate studies in animals, but not non-mammalian species, may be proposed to develop or advance the needed technology. Any intermediate studies must articulate a clear path of the proposed methodology to application in awake humans or define the limitations and the usefulness in anesthetized humans.
Grant$500KCloses 2026-10-01USHealthFY26 Bureau of Land Management Plant Conservation and Restoration Management - Bureau wide
→The Bureau of Land Management"s Plant Conservation and Restoration Program (PCRP) is a national leader in building the native seed supply chain essential for restoring resilient public lands and supporting multiple use and sustained yield. PCRP advances Department of the Interior mission to protect and manage America's natural resources. The native seed PCRP adds to the commercial market enables rapid recovery following wildfire, hurricanes, and other natural disasters; can be used by proponents to help satisfy revegetation requirements for energy and infrastructure projects; and helps farmers and creates jobs by expanding market access for small producers.A core mission of PCRP is to grow the national native seed supply chain through partnerships with eligible state, tribal, academic, and non-governmental organizations. Reliable native seed supplies are critical to improving rangeland health, restoring wildlife habitat and migration corridors, reclaiming mined and timber-harvested lands, and reducing invasive species. Expanding this pipeline lowers seed costs, reduces producer risk, creates American jobs, and ensures long-term project success with durable vegetative establishment.In 2026, PCRP is strategically focused on:Local seed collections to diversify species in the marketplace while creating employment opportunities.Support for farmers and nonprofits entering the native seed market to strengthen rural economies and shared stewardship.Nursery production of species unsuitable for direct seeding to support healthy rangelands, forests and watersheds, big game and healthy wildlife habitat,Applied science and innovation to reduce costs, lower risk, and improve restoration outcomes.Manage native plant communities and special status plants to maintain multiple use and sustained yieldPCRP seeks partnerships to:Collaborate with state agriculture departments, NRCS, and others to expand farmer access to the seed market.Work with wildlife agencies and others to implement post-fire recovery, restore migration corridors, and protect priority species.Develop technology and infrastructure for seed collection, cleaning, banking, and production of hard-to-grow species.Advance applied science to sustain special status plant species and prevent regulatory impacts on energy development.Support technology development, technology transfer and education so native seed is used more effectively. Integrate native seed use across BLM programs including Wildlife, Oil & Gas, Minerals, Fuels, Range, and Renewable Energy.Through this NOFO, PCRP invites partners to join in strengthening America"s native seed supply chain—ensuring healthier public lands, stronger rural economies, and cost effective lasting ecological resilience.
Grant$500KCloses 2026-09-28USEnvironmentGREGoRi Innovation Projects (U01 Clinical Trial Optional)
→The Genomics Research to Elucidate the Genetics of Rare Diseases:innovation (GREGoRi) initiative seeks to accelerate a paradigm shift in rare disease diagnosis by reimagining the tools, molecular technologies and analytical approaches used to identify the causal gene(s) and/or variant(s) underlying rare genetic disorders. This Notice of Funding Opportunity is intended to stimulate the development and testing of highly innovative experimental or computational approaches for rare disease diagnosis, that have the potential to make transformative improvements to the current state of the art.
Grant$500KCloses 2026-10-30USHealth
Always confirm details on the official source before applying — see our methodology.