Manchester International Airport Phase 2 - Overbridge Civils
The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The works comprise the construction and completion of the bridge structure and associated highway infrastructure, including: • Installation of client-supplied precast bridge components, including cills, beams and side walls, together with associated shear key reinforcement and grout connections. • Modification of existing bridge cill. • Supply and installation of bridge bearing plates, including associated screed works. • Construction of pile caps/infill. • Placement of in-situ concrete shear key infill. • Construction of the reinforced concrete bridge deck slab. • Construction of reinforced concrete parapet walls. • Placement of in-situ concrete footpaths and fill areas. • Construction of pilasters, including reinforced concrete and brickwork elements. • Supply and installation of parapet and pilaster copings. • Construction of associated fencing, signage and PCC retaining wall. • Installation of associated ducting works. • Completion of highway works excluding final road surfacing. • Application of bridge waterproofing systems, installation of expansion joints, and completion of associated sealing and mastic works. • Construction of associated drainage works. Exclusions: Final road/footpath surfacing works are excluded from this scope.
Don't miss the next one like this
New construction grants in GB open all the time. Get a free weekly email with only the ones that match — nothing else.
Want help winning this?
Enter your email and we'll send the official application link, deadlines and pointers right away — free. Want a hand? Tick the box and we'll introduce you to a vetted grant or bid writer. The intro's free, and you only pay if you choose to work with them.
Related opportunities
See all alternatives →More grants — Construction · GB
A66 Northern Trans Pennine Project(NTP) - Carleton Underpass Structure (Precast Concrete Beams)
→Kier Infrastructure intends to engage experienced and qualified bridge installation contractors for the erection of Carleton Underpass on Scheme 2 of the A66 Northern Transpennine Project. The scope is for the installation of pre-cast concrete beams and the ancillary works. The A66 upgrade will see single-lane sections of the 80km stretch between the M6 and the A1 made into dual carriageway, while key junctions will be improved. The A66 project is to be delivered in collaboration by three Tier 1 contractors, Balfour Beatty, Kier and Keltbray. The A66 project is to be delivered in collaboration by three Tier 1 contractors, Balfour Beatty, Kier and Keltbray. We will use the Build UK Common Assessment Criteria (CAS) to ensure a consistent minimum business competence. If your company possesses necessary qualifications and is interested in bidding for this project, please email infrastructure.procurement@kier.co.uk with your company's portfolio, relevant experience, and references for further evaluation.
Tender$13.3MCloses in 12 daysGBConstructionDNWP0016 - WAGR Enabling Works and Strip-out - Sellafield - A2R JV
→WAGR Overview and Site Information The Windscale Advanced Gas-cooled Reactor (WAGR), commissioned in 1962, was the prototype for the UK's second-generation Advanced Gas-cooled Reactor (AGR) fleet. The facility (Building B50), recognised by its distinctive spherical containment shell, was supported by the fuel assembly building (B52) and turbine hall (B55). Following reactor core dismantling and removal in 2012, the WAGR Complex entered Care and Maintenance (C&M). The facility is now progressing towards its final phase of decommissioning and demolition. Existing records confirm the presence of Low-Level Waste (LLW) and Intermediate-Level Waste (ILW), resulting in ongoing radiological and contamination hazards. All buildings within the WAGR area are owned by the Remediation operating unit, remain under active surveillance and maintenance, and are classified as Beta Gamma contamination facilities. Project Scope The scope comprises enabling, strip-out, waste management and decommissioning support activities across the WAGR facility, alongside support for wider Windscale decommissioning programmes and emergent operational requirements. Key activities include (see attachment) - Strip-out Works: Internal and external removal of fixtures, fittings, equipment and non-structural elements to facilitate future decommissioning and demolition activities. - Radiological Waste Management: Safe handling, removal and management of LLW and ILW in accordance with site requirements. - Asset Reinstatement: Delivery of asset reinstatement works and provision of SQEP resources to support successful handover. - Pre-Construction Information (PCI): Support information gathering and site characterisation where existing PCI is insufficient. - Surveys: Plan and undertake surveys to assess radiological, hazardous and operational conditions in support of future decommissioning works. - Project Enabling Works: Design, fabricate, trial and implement enabling solutions, equipment and materials to support project delivery. - Asbestos Management: Planning, sampling, monitoring and licensed asbestos removal where required. - Procurement: Procurement of materials, equipment and associated quality documentation. - Waste Management: Sorting, segregation, consolidation and disposal of current and historical wastes, including completion of documentation for transfer to Sellafield Waste Coordinators. - Emergent Works: Rapid response support to operations and maintenance teams for safety-critical issues. - Temporary Works: Management, design and construction of temporary works, including scaffolding, enclosures and other supporting structures. - Decontamination: Decontamination activities to support area declassification and radiological rollback. - Plant Modifications: Production of Plant Modification Proposals (PMPs) and associated documentation. - Scaffolding Services: Provision of scaffolding design, supply and installation resources as required. Additional information: https://www.linkedin.com/company/a2r-altrad-atkinsrealis-remediation https://www.gov.uk/government/news/sellafield-ltd-awards-high-hazard-risk-reduction-framework-contract
Tender$26.7MCloses in 10 daysGBConstructionCA18487 - DN Colleges Group - North Lindsey College - ITT for Global House Reclad and Refurbishment Project
→This document is an invitation to tender (ITT) for the design and construction of the proposed recladding and refurbishment works to Global House, an existing DN Colleges facility within their North Lindsey Campus. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18487. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18487 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Tender$4.6MCloses in 6 daysGBConstructionRooftop Solar PV O&M Framework 2027
→WSCC require a contractor to carry out reactive call-out visits, a contractor to undertake all inspections, a supplier undertake planned repairs and maintenance of rooftop mounted solar PV systems and Supplier to undertake planned repairs and maintenance of its domestic systems on applicable sites. This is a 4 year multi supplier framework.
Tender$3.4MCloses 2026-11-13GBConstructionBBV HS2 MWCC North - Pumped Drainage
→Balfour Beatty VINCI (BBV) have been awarded HS2 main works civils contracts for the Area North project in the West Midlands. We are looking to engage with an experienced contractor supply chain who provide Pumped Drainage works. Full details and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of works, prior to completing this expression of interest (EOI).
Tender$6.7MCloses in 4 daysGBConstructionCA18576 - Electrical Maintenance. 4 Year Opportunity
→New College Swindon invites tenders for Electrical Maintenance Services, including planned maintenance, statutory testing, reactive repairs and associated electrical works across the college estate. Fixed-term contract: 4 years. Estimated value: £400,000. Full details are provided within the tender documentation. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18576. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18576 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Tender$536KCloses 2026-11-19GBConstruction
People also viewed
Other grants visitors looked at from Kier Transportation - CP7 NWC.
Additional activities for the European Partnership of Agriculture of Data
→Expected Outcome: The successful proposal is expected to further contribute to the expected outcomes specified in topic HORIZON-CL6-2024-GOVERNANCE-02-01: European Partnership of Agriculture of Data, for continuation of the activities in line with already agreed outcomes. Scope: The objective of this action is to continue to provide support to the European partnership of Agriculture of Data identified in the Horizon Europe Strategic Plan 2021-2024 and first implemented under the topic HORIZON-CL6-2024-GOVERNANCE-02-01: European Partnership of Agriculture of Data, and in particular to fund additional activities (which may also be undertaken by additional partners) in view of its intended scope and duration, and in accordance with Article 24(2) of the Horizon Europe Regulation. The consortium which applied to and received funding under HORIZON-CL6-2024-GOVERNANCE-02-01: European Partnership of Agriculture of Data is uniquely placed to submit a proposal to continue the envisioned partnership. Not only did this consortium submit the proposal leading to the identification of the partnership in the Horizon Europe strategic planning 2021-2024, it has also been implementing the…
Grant$67.1MCloses 2026-11-26EUAgriculture & FoodSilicon Carbide Cladding Lead Test Rod Development-Phase 1
→Silicon Carbide Cladding Lead Test Rod Development-Phase 1Research, development, and fabrication of Silicon Carbide cladding specimens for research reactor insertion, irradiation, and post-irradiation examinations by 2030. The objective of this program is to advance the scientific and technological maturity of silicon carbide cladding for nuclear fuel rods for future use in commercial light water reactors.
Grant$62.5MCloses 2026-12-07USEnergyGreat British Energy (GBE) Supply Chain Fund: Offshore Wind and Networks
→The Great British Energy (GBE) Supply Chain Fund: Offshore Wind and Networks will award up to £300 million in capital grant funding to build UK manufacturing capacity for key constrained components in offshore wind and enabling electricity networks sectors. Funding must be used to construct new or extend existing manufacturing facilities in the UK. The application window will close 10 December 2026 (or earlier if the Fund's budget is fully allocated).
Grant$401MCloses 2026-12-10GBEnergyData sharing to support the training and development of AI foundation models in the energy sector
→Expected Outcome: Projects are expected to contribute to all the following expected outcomes: Effective and innovative methods for gathering, sharing and using large data sets in energy applications for the purpose of training AI models while ensuring privacy and security. Advanced and - wherever possible - open-source AI foundation models to support the digitalisation of the energy system, through improved grid observability, forecasting of supply and demand, advanced storage and renewables integration, demand side flexibility and energy efficiency. Enhanced cooperation, knowledge sharing and interoperability among energy system actors for secure and seamless data exchange. Advanced methodologies for AI model development ensuring that the results are FAIR (Findable, Accessible, Interoperable, Reusable) beyond the project ending, open source and accommodating for technology evolution. Scope: The quality of AI models depends strongly on the amount, quality, and representativeness of the data used for their training. Projects are expected to focus on developing, training and testing AI foundation models, using extensive data sets to accelerate the energy transition in key focus…
Grant$11.2MCloses 2026-12-01EUEducation
Always confirm details on the official source before applying — see our methodology.