Ascent Homes - Coulson Park - Groundworks
Advance Northumberland (Developments) Limited, trading as Advance Northumberland (Developments) Ltd requires a Groundworks sub-contractor for our new build housing development consisting of 57no new build plots in Coulson Park, Ashington, Northumberland. All tender documentation can be found on the ProContract Portal.
Don't miss the next one like this
New construction grants in GB open all the time. Get a free weekly email with only the ones that match — nothing else.
Want help winning this?
Enter your email and we'll send the official application link, deadlines and pointers right away — free. Want a hand? Tick the box and we'll introduce you to a vetted grant or bid writer. The intro's free, and you only pay if you choose to work with them.
Related opportunities
See all alternatives →More grants — Construction · GB
A66 Northern Trans Pennine Project(NTP) - Carleton Underpass Structure (Precast Concrete Beams)
→Kier Infrastructure intends to engage experienced and qualified bridge installation contractors for the erection of Carleton Underpass on Scheme 2 of the A66 Northern Transpennine Project. The scope is for the installation of pre-cast concrete beams and the ancillary works. The A66 upgrade will see single-lane sections of the 80km stretch between the M6 and the A1 made into dual carriageway, while key junctions will be improved. The A66 project is to be delivered in collaboration by three Tier 1 contractors, Balfour Beatty, Kier and Keltbray. The A66 project is to be delivered in collaboration by three Tier 1 contractors, Balfour Beatty, Kier and Keltbray. We will use the Build UK Common Assessment Criteria (CAS) to ensure a consistent minimum business competence. If your company possesses necessary qualifications and is interested in bidding for this project, please email infrastructure.procurement@kier.co.uk with your company's portfolio, relevant experience, and references for further evaluation.
Tender$13.3MCloses in 14 daysGBConstructionDNWP0016 - WAGR Enabling Works and Strip-out - Sellafield - A2R JV
→WAGR Overview and Site Information The Windscale Advanced Gas-cooled Reactor (WAGR), commissioned in 1962, was the prototype for the UK's second-generation Advanced Gas-cooled Reactor (AGR) fleet. The facility (Building B50), recognised by its distinctive spherical containment shell, was supported by the fuel assembly building (B52) and turbine hall (B55). Following reactor core dismantling and removal in 2012, the WAGR Complex entered Care and Maintenance (C&M). The facility is now progressing towards its final phase of decommissioning and demolition. Existing records confirm the presence of Low-Level Waste (LLW) and Intermediate-Level Waste (ILW), resulting in ongoing radiological and contamination hazards. All buildings within the WAGR area are owned by the Remediation operating unit, remain under active surveillance and maintenance, and are classified as Beta Gamma contamination facilities. Project Scope The scope comprises enabling, strip-out, waste management and decommissioning support activities across the WAGR facility, alongside support for wider Windscale decommissioning programmes and emergent operational requirements. Key activities include (see attachment) - Strip-out Works: Internal and external removal of fixtures, fittings, equipment and non-structural elements to facilitate future decommissioning and demolition activities. - Radiological Waste Management: Safe handling, removal and management of LLW and ILW in accordance with site requirements. - Asset Reinstatement: Delivery of asset reinstatement works and provision of SQEP resources to support successful handover. - Pre-Construction Information (PCI): Support information gathering and site characterisation where existing PCI is insufficient. - Surveys: Plan and undertake surveys to assess radiological, hazardous and operational conditions in support of future decommissioning works. - Project Enabling Works: Design, fabricate, trial and implement enabling solutions, equipment and materials to support project delivery. - Asbestos Management: Planning, sampling, monitoring and licensed asbestos removal where required. - Procurement: Procurement of materials, equipment and associated quality documentation. - Waste Management: Sorting, segregation, consolidation and disposal of current and historical wastes, including completion of documentation for transfer to Sellafield Waste Coordinators. - Emergent Works: Rapid response support to operations and maintenance teams for safety-critical issues. - Temporary Works: Management, design and construction of temporary works, including scaffolding, enclosures and other supporting structures. - Decontamination: Decontamination activities to support area declassification and radiological rollback. - Plant Modifications: Production of Plant Modification Proposals (PMPs) and associated documentation. - Scaffolding Services: Provision of scaffolding design, supply and installation resources as required. Additional information: https://www.linkedin.com/company/a2r-altrad-atkinsrealis-remediation https://www.gov.uk/government/news/sellafield-ltd-awards-high-hazard-risk-reduction-framework-contract
Tender$26.8MCloses in 12 daysGBConstructionCA18487 - DN Colleges Group - North Lindsey College - ITT for Global House Reclad and Refurbishment Project
→This document is an invitation to tender (ITT) for the design and construction of the proposed recladding and refurbishment works to Global House, an existing DN Colleges facility within their North Lindsey Campus. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18487. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18487 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Tender$4.6MCloses in 8 daysGBConstructionRooftop Solar PV O&M Framework 2027
→WSCC require a contractor to carry out reactive call-out visits, a contractor to undertake all inspections, a supplier undertake planned repairs and maintenance of rooftop mounted solar PV systems and Supplier to undertake planned repairs and maintenance of its domestic systems on applicable sites. This is a 4 year multi supplier framework.
Tender$3.4MCloses 2026-11-13GBConstructionBBV HS2 MWCC North - Pumped Drainage
→Balfour Beatty VINCI (BBV) have been awarded HS2 main works civils contracts for the Area North project in the West Midlands. We are looking to engage with an experienced contractor supply chain who provide Pumped Drainage works. Full details and specifications will be provided to the successfully shortlisted suppliers. Suppliers should be aware of the scale of this project and should assess their internal capabilities to be able to carry out the intended scope of works, prior to completing this expression of interest (EOI).
Tender$6.7MCloses in 6 daysGBConstructionCA18576 - Electrical Maintenance. 4 Year Opportunity
→New College Swindon invites tenders for Electrical Maintenance Services, including planned maintenance, statutory testing, reactive repairs and associated electrical works across the college estate. Fixed-term contract: 4 years. Estimated value: £400,000. Full details are provided within the tender documentation. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18576. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18576 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Tender$536KCloses 2026-11-19GBConstruction
People also viewed
Other grants visitors looked at from Advance Northumberland Limited.
Always confirm details on the official source before applying — see our methodology.