Ascent Homes - Coulson Park - Roads & Sewers
Advance Northumberland (Developments) Limited, trading as Advance Northumberland (Developments) Ltd requires a Roads & Sewers sub-contractor for our new build housing development consisting of 57no new build plots in Coulson Park, Ashington, Northumberland. All tender documentation can be found on the ProContract Portal
Don't miss the next one like this
New construction grants in GB open all the time. Get a free weekly email with only the ones that match — nothing else.
Want help winning this?
Enter your email and we'll send the official application link, deadlines and pointers right away — free. Want a hand? Tick the box and we'll introduce you to a vetted grant or bid writer. The intro's free, and you only pay if you choose to work with them.
Related opportunities
See all alternatives →More grants — Construction · GB
CA18389 - Leeds College of Building - Principal Contractor
→Leeds College of Building are looking for a Principal Contractor to undertake the design, construction, management and delivery of refurbishment works to the newly named CTEC Building, located on Byron Street, Leeds. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18389. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18389 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Tender$18.9MCloses in 9 daysGBConstructionDNWP0073 - Lot 1B/In-SEP ID - Controlled Area Initial Decommissioning Operations
→The anticipated scope for DNWP0073 is indicatively only. The Contractor requires support to the Inside Controlled Area (In-SEP) Decommissioning Operations. This will take the form of the provision of resource, up to 30 Full Time Equivalent (FTE), with an appropriate ratio of blue:white collar resources to be determined by the Subcontractor to best meet the Initial Decommissioning (ID) activities required by the Contractor. A current contract is in place until 31st March 2027 to prove the concept and develop an initial operating capability. This EOI relates to the longer-term works anticipated to commence thereafter, with an estimated duration of 24 months. The tasks undertaken will be broad and varied, and will be located in existing In-SEP and any future In-SEP buildings. Broadly, the Subcontractor will be required to provide Operational Support to the ID capability, build upon the previously developed ID capability, drive future improvements and assist in building scope of ID workload. Specific work and details will be decided by the ID In-SEP, Delivery Board and locally on plant at Plant Operations Control Centres (POCCs). Initial works will include waste removal, waste packaging and despatch and size reduction. Deplanting, involving the removal, lifting, size reduction and transport of redundant plant will also be required. Works will grow and develop in complexity as the capability matures, subject to providing ongoing Value for Money. (VFM) Tasks which meet the definition of 'Construction' (CDM 2015 Part 1 Regulation 2) should now be anticipated and appropriate management and supervision arrangements incorporated. This Contract Opporutnity represents a long-term commitment by the Contractor to further develop the Suitably Qualified and Experienced Person (SQEP) workforce of the Subcontractor to undertake works in uniquely hazardous facilities requiring prior knowledge and experience. The Subcontractor will be responsible for the design of all temporary works, this is anticipated to primarily be access/scaffolding but may also include design of lifting plans. The Subcontractor will ensure a safe sequence is adhered to for all activities. This may require the use of Contractor's structural/mechanical engineer on an ad-hoc basis. The Subcontractor shall integrate and co-ordinate its design with the following design of the Contractor and Others. The Subcontractor shall submit all temporary works plans to the Project Manager for acceptance prior to erection. The Subcontractor will be responsible for ensuring an appropriate level of checking and approval for their designs. The review period for the Project Manager to review the Review Documents is up to 2 weeks (10 working days). No temporary works will be erected until the Review Documentation has been authorised by the Project Manager. Important: Delivery is within a live operational environment, and scope is subject to change. Additional information: https://www.linkedin.com/company/a2r-altrad-atkinsrealis-remediation https://www.gov.uk/government/news/sellafield-ltd-awards-high-hazard-risk-reduction-framework-contract
Tender$27MCloses in 5 daysGBConstructionTD2414 - Asbestos Removal and Remediation Services and Asbestos Analyst Services
→Derby City Council (the Council) is undertaking this procurement to establish two contracts: • Lot 1 Asbestos removal and remediation services • Lot 2 Asbestos analyst services The procurement process adopted by the Council is based on the 'Open' tendering procedure as detailed in the Procurement Act 2023 (the "Act") and the Procurement Regulations 2024 (the "Regulations".) For Lot 1 the asbestos removal and remediation services contract, the initial contract period is two years and is estimated to commence on 1st February 2027 and expire on 31st January 2029. For Lot 2 the asbestos analyst services contract, the initial contract period is two years and is estimated to commence on 13th February 2027 and expire on 12th February 2029. For both contracts there will be an option to extend the contract for three (3) years in annual increments, subject to satisfactory performance and business needs. Maximum contract period is five (5) years. Local Government Reorganisation (LGR) is underway in several areas across the country and may result in changes to council structures, service delivery and responsibilities, and geographical coverage during the life of the contract. For this contract it is anticipated that the effects of LGR may lead to an increased service demand or the need to extend provision to new areas or client groups. For Lot 1 the asbestos removal and remediation services contract, bidders should note that the total estimated contract value of £1,172,000, comprises of two components: i) The core contract value, estimated at £293,000, based on known current service requirements ii) An additional estimated value of £879,000 to reflect potential future changes in service scope or volume linked to LGR. For Lot 2 the asbestos analyst services contract, bidders should note that the total estimated contract value of £2,616,000, comprises of two components: i) The core contract value, estimated at £654,000, based on known current service requirements ii) An additional estimated value of £1,962,000 to reflect potential future changes in service scope or volume linked to LGR. These figures are estimations and due to only being in the early stages of the process the Authority cannot give any commitment on these figures but would like to build scope into the Contract should the need arise.
Tender$5.1MCloses 2026-10-15GBConstructionCA18408 - Mental Health Emergency Department (MH ED)
→Tender to undertake building works to remodel existing estate to provide a new Mental Health ED department. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18408. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18408 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Tender$3.4MCloses 2026-10-12GBConstructionProvide the Fit Out of 1st Floor of Waterdale, Doncaster DN1 3BU
→Provide the Fit Out of 1st Floor of Waterdale CYP Service, Health on the High Street, Doncaster, DN1 3BU for Rotherham Doncaster & South Humber NHS Foundation Trust. Additional information: To express interest and participate in the tender, please register and apply via Atamis e-sourcing portal https://health-family.force.com/s/Welcome. Should Tenderers have any queries, or having problems using the portal, they should contact Helpdesk at: Phone: 0800 9956035 E-mail: support-health@atamis.co.uk
Tender$2.8MCloses 2026-10-02GBConstructionBLD-3163 Store 54 Independent Heating Solution - Delivery
→High level summary of the project includes: Undertaken roof repair as there are leaks throughout. Installation of roof insulation and suspended ceiling. Upgrade of all glazing and doors (including fire doors). Strip out of existing M&E services/plant. Installation of VRV/VRF system and ASHP. Upgrade of all lighting and ensuring complete electrical installation is ATEX/DSEAR compliant. Note, a Stage 3 design and report will be provided and we would expect a stage 4 design/report before we progress with the build stage.
Tender$1.4MCloses in 3 daysGBConstruction
Always confirm details on the official source before applying — see our methodology.