Depot Charging Scheme
The Depot Charging Scheme supports uptake of zero-emission HGVs, vans and coaches by part-funding the installation of charging infrastructure at fleet depots. The first application window runs from 25 March 2026 to 30 June 2026 (or earlier if funding is exhausted), and will fund 70% of charge point and civil costs, up to £1 million across all sites.
Want help applying?
Get matched with a grant or bid writer who can prepare this application. No obligation.
- Eligibility
- Open to: Public Sector, Non-profit, Private Sector, Local authority.
Related opportunities
See all alternatives →Zero Emission Vessels and Infrastructure 2: Electric Power
→UK registered organisations can apply for a share of up to £150 million. The funding will be to develop, deploy and operate innovative clean maritime solutions for three years in a real world environment. This funding is from the Department for Transport.
Grant$40.3MCloses 2026-09-16GBEnergyZero Emission Vessels and Infrastructure 2: Energy Efficiency
→UK registered organisations can apply for a share of up to £150 million. The funding will be to develop, deploy and operate innovative clean maritime solutions for three years in a real world environment. This funding is from the Department for Transport.
Grant$40.3MCloses 2026-09-16GBEnergyZero Emission Vessels and Infrastructure 2: Alternative Fuels
→UK registered organisations can apply for a share of up to £150 million. The funding will be to develop, deploy and operate innovative clean maritime solutions for three years in a real world environment. This funding is from the Department for Transport.
Grant$40.3MCloses 2026-09-16GBEnergyGB-Thanckes: OPA/T856 Supply a Service to Supply F76 Fuel Filtering/Polishing - Thanckes
→OPA require to appoint an appropriate contractor to conduct Filtering/Polishing of F76 fuel stored at OFD Thanckes. OPA require the filtering/polishing of the F76 that has failed the filter blocking tendency (FBT) tests. Our requirement is to restore the F76 to our required specification. Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
Tender$674KCloses in 2 daysGBEnergyGreat British Energy (GBE) Supply Chain Fund: Offshore Wind and Networks
→The Great British Energy (GBE) Supply Chain Fund: Offshore Wind and Networks will award up to £300 million in capital grant funding to build UK manufacturing capacity for key constrained components in offshore wind and enabling electricity networks sectors. Funding must be used to construct new or extend existing manufacturing facilities in the UK. The application window will close 10 December 2026 (or earlier if the Fund's budget is fully allocated).
Grant$403.4MCloses 2026-12-10GBEnergyElectric vehicle chargepoint grant for residential landlords
→This grant provides landlords with support towards the cost of the purchase and installation of electric vehicle chargepoints at residential properties.
Grant$134KCloses 2027-04-01GBEnergy
Always confirm details on the official source before applying — see our methodology.