EKFB JV - NC2A WGT Portal Buildings Blockwork package
NC2A is the North Chilterns to Aylesbury section of C23, a part of the HS2 project managed by the EKFB Joint Venture. We are seeking a specialist subcontractor to undertake the following works within the NC2A section: The Subcontractor shall provide all necessary management, supervision, plant, labour, materials and temporary works to deliver the blockwork package for Wendover Green Tunnel Portal Buildings. The works comprise the construction of external masonry walls and internal masonry partition walls, including the supply and installation of the following, but not limited to: •Concrete blockwork on the external perimeter walls to be on a 150mm x 140mm concrete upstand • Internal partition walls are to be founded directly on the structural foundation slab. • Sand and cement skirting •440x215x140mm 7.3N/mm2 1450kg/m3 concrete blockwork, including all associated connections and movement joints •Stainless steel bed joint reinforcement and all masonry ties •Padstones •Concrete lintels •Wall head fire stopping system Please carefully consider the information above and whether this opportunity is suitable for your business before registering your interest.
Don't miss the next one like this
New construction grants in GB open all the time. Get a free weekly email with only the ones that match — nothing else.
Want help winning this?
Enter your email and we'll send the official application link, deadlines and pointers right away — free. Want a hand? Tick the box and we'll introduce you to a vetted grant or bid writer. The intro's free, and you only pay if you choose to work with them.
Related opportunities
See all alternatives →More grants — Construction · GB
DNWP0073 - Lot 1B/In-SEP ID - Controlled Area Initial Decommissioning Operations
→The anticipated scope for DNWP0073 is indicatively only. The Contractor requires support to the Inside Controlled Area (In-SEP) Decommissioning Operations. This will take the form of the provision of resource, up to 30 Full Time Equivalent (FTE), with an appropriate ratio of blue:white collar resources to be determined by the Subcontractor to best meet the Initial Decommissioning (ID) activities required by the Contractor. A current contract is in place until 31st March 2027 to prove the concept and develop an initial operating capability. This EOI relates to the longer-term works anticipated to commence thereafter, with an estimated duration of 24 months. The tasks undertaken will be broad and varied, and will be located in existing In-SEP and any future In-SEP buildings. Broadly, the Subcontractor will be required to provide Operational Support to the ID capability, build upon the previously developed ID capability, drive future improvements and assist in building scope of ID workload. Specific work and details will be decided by the ID In-SEP, Delivery Board and locally on plant at Plant Operations Control Centres (POCCs). Initial works will include waste removal, waste packaging and despatch and size reduction. Deplanting, involving the removal, lifting, size reduction and transport of redundant plant will also be required. Works will grow and develop in complexity as the capability matures, subject to providing ongoing Value for Money. (VFM) Tasks which meet the definition of 'Construction' (CDM 2015 Part 1 Regulation 2) should now be anticipated and appropriate management and supervision arrangements incorporated. This Contract Opporutnity represents a long-term commitment by the Contractor to further develop the Suitably Qualified and Experienced Person (SQEP) workforce of the Subcontractor to undertake works in uniquely hazardous facilities requiring prior knowledge and experience. The Subcontractor will be responsible for the design of all temporary works, this is anticipated to primarily be access/scaffolding but may also include design of lifting plans. The Subcontractor will ensure a safe sequence is adhered to for all activities. This may require the use of Contractor's structural/mechanical engineer on an ad-hoc basis. The Subcontractor shall integrate and co-ordinate its design with the following design of the Contractor and Others. The Subcontractor shall submit all temporary works plans to the Project Manager for acceptance prior to erection. The Subcontractor will be responsible for ensuring an appropriate level of checking and approval for their designs. The review period for the Project Manager to review the Review Documents is up to 2 weeks (10 working days). No temporary works will be erected until the Review Documentation has been authorised by the Project Manager. Important: Delivery is within a live operational environment, and scope is subject to change. Additional information: https://www.linkedin.com/company/a2r-altrad-atkinsrealis-remediation https://www.gov.uk/government/news/sellafield-ltd-awards-high-hazard-risk-reduction-framework-contract
Tender$27MCloses todayGBConstructionTD2414 - Asbestos Removal and Remediation Services and Asbestos Analyst Services
→Derby City Council (the Council) is undertaking this procurement to establish two contracts: • Lot 1 Asbestos removal and remediation services • Lot 2 Asbestos analyst services The procurement process adopted by the Council is based on the 'Open' tendering procedure as detailed in the Procurement Act 2023 (the "Act") and the Procurement Regulations 2024 (the "Regulations".) For Lot 1 the asbestos removal and remediation services contract, the initial contract period is two years and is estimated to commence on 1st February 2027 and expire on 31st January 2029. For Lot 2 the asbestos analyst services contract, the initial contract period is two years and is estimated to commence on 13th February 2027 and expire on 12th February 2029. For both contracts there will be an option to extend the contract for three (3) years in annual increments, subject to satisfactory performance and business needs. Maximum contract period is five (5) years. Local Government Reorganisation (LGR) is underway in several areas across the country and may result in changes to council structures, service delivery and responsibilities, and geographical coverage during the life of the contract. For this contract it is anticipated that the effects of LGR may lead to an increased service demand or the need to extend provision to new areas or client groups. For Lot 1 the asbestos removal and remediation services contract, bidders should note that the total estimated contract value of £1,172,000, comprises of two components: i) The core contract value, estimated at £293,000, based on known current service requirements ii) An additional estimated value of £879,000 to reflect potential future changes in service scope or volume linked to LGR. For Lot 2 the asbestos analyst services contract, bidders should note that the total estimated contract value of £2,616,000, comprises of two components: i) The core contract value, estimated at £654,000, based on known current service requirements ii) An additional estimated value of £1,962,000 to reflect potential future changes in service scope or volume linked to LGR. These figures are estimations and due to only being in the early stages of the process the Authority cannot give any commitment on these figures but would like to build scope into the Contract should the need arise.
Tender$5.1MCloses 2026-10-15GBConstructionCA18389 - Leeds College of Building - Principal Contractor
→Leeds College of Building are looking for a Principal Contractor to undertake the design, construction, management and delivery of refurbishment works to the newly named CTEC Building, located on Byron Street, Leeds. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18389. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18389 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Tender$18.9MCloses in 4 daysGBConstructionA66 Northern Trans-Pennine Project (NTP) - Scheme 1 & 2 Pavement Construction
→Kier Infrastructure intends to engage experienced and qualified pavement construction contractors for the full construction of roads and pavements, including but not limited to construction of base, binder and surface courses, surface treatment and planing across Schemes 1 & 2 of the A66 Northern Trans-Pennine Scheme. The A66 project is to be delivered in collaboration by three Tier 1 contractors, Balfour Beatty, Kier and Keltbray. We will use the Build UK Common Assessment Criteria (CAS) to ensure a consistent minimum business competence. If your company possesses necessary qualifications and is interested in bidding for this project, please email infrastructure.procurement@kier.co.uk with your company's portfolio, relevant experience, and references for further evaluation.
Tender$8.7MCloses in 6 daysGBConstructionCA18408 - Mental Health Emergency Department (MH ED)
→Tender to undertake building works to remodel existing estate to provide a new Mental Health ED department. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18408. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18408 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Tender$3.4MCloses 2026-10-12GBConstructionProvide the Fit Out of 1st Floor of Waterdale, Doncaster DN1 3BU
→Provide the Fit Out of 1st Floor of Waterdale CYP Service, Health on the High Street, Doncaster, DN1 3BU for Rotherham Doncaster & South Humber NHS Foundation Trust. Additional information: To express interest and participate in the tender, please register and apply via Atamis e-sourcing portal https://health-family.force.com/s/Welcome. Should Tenderers have any queries, or having problems using the portal, they should contact Helpdesk at: Phone: 0800 9956035 E-mail: support-health@atamis.co.uk
Tender$2.8MCloses 2026-10-02GBConstruction
People also viewed
Other grants visitors looked at from Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3.
EKFB JV - G2S - Central - Stair & Hard Landscaping Trial / Works
→EKFB are looking for a Subcontractor for the design, supply, installation, management and completion of the Claydon Road Overbridge Access Stairs and Hard Slope (hard landscaping) trial works, including all labour, plant, equipment, materials, temporary works, supervision and quality documentation required to deliver the works. Works to include the following elements Review of the proposed product requirements and recommendation of suitable alternatives where applicable. Preparation and submission of shop drawings for acceptance. Supply and installation of: GRP stair panels Posts Hollow blocks Fixings and consumables Paving slabs Edging kerbs Associated stair and hard slope components Installation of aggregate and topsoil in accordance with permanent works specifications. Identification of any exclusions necessary to complete the works. Trial Works will then inform the methodology on how we proceed going forward with further structures within the G2S section of the works, if successful leading to future works. G2S have approximately 29 sets of Access Stairs of various lengths to be supplied and / or installed.
Tender$1.3MCloses in 8 daysGBConstructionF26AS00071 Cooperative Endangered Species Conservation Fund: Habitat Conservation Plan Land Acquisition Grants
→Established by Congress in fiscal year (FY) 1997, the Habitat Conservation Plan (HCP) Land Acquisition Grant program was designed to reduce conflicts between the conservation of listed species and competing land uses on specific parcels of land associated with approved and permitted HCPs. Under this program, the U.S. Fish and Wildlife Service (FWS) provides matching grants to State agencies in support of land acquisition projects that will conserve species habitat in perpetuity through fee simple acquisition or the acquisition of permanent conservation easements. FWS considers the use of Federal acquisition dollars by States for habitat protection associated with HCPs to be an important and effective mechanism to promote species recovery, prevent extinction, and preclude the need to list species under the Endangered Species Act (ESA) in the future. All land acquired through these grants complements, but does not replace, the mitigation, minimization, and/or monitoring commitments of the HCP. Thus, this work is additive to the conservation commitments entered into when HCPs are permitted and serves as a meaningful way to leverage non-Federal investment in species recovery and connect conservation lands across the landscape.
Grant$26MCloses 2026-10-30USEnvironmentRESTORE Act Direct Component - Non-Construction Activities
→Treasury is publishing multiple funding opportunity announcements (FOAs) for its RESTORE Act grant programs. This announcement applies only to the Direct Component and is only for applications for eligible non-construction activities, including projects with or without a non-federal cost-share for another federally funded project or program. This announcement also includes planning assistance needed to prepare the Multiyear Implementation Plan (Multiyear Plan) required by the RESTORE Act. To apply for eligible activities involving construction and/or acquisition of real property or any other activity that requires a permit from a federal or state agency, including natural resource restoration projects, applicants should use the construction and real property acquisition funding opportunity announcement (GR-RDC-25-002).Trust Fund amounts are available to carry out eligible activities described in the RESTORE Act and Treasury’s implementing regulations at 31 CFR 34.201. These are: 1) Restoration and protection of the natural resources, ecosystems, fisheries, marine and wildlife habitats, beaches and coastal wetlands of the Gulf Coast region. 2) Mitigation of damage to fish, wildlife, and natural resources. 3) Implementation of a Federally- approved marine, coastal, or comprehensive conservation management plan, including fisheries monitoring. 4) Workforce development and job creation. 5) Improvements to or on State parks located in coastal areas affected by the Deepwater Horizon oil spill. 6) Infrastructure projects benefitting the economy or ecological resources, including port infrastructure. 7) Coastal flood protection and related infrastructure.8) Promotion of tourism in the Gulf Coast region, including promotion of recreational fishing. 9) Promotion of the consumption of seafood harvested from the Gulf Coast region. 10) Planning assistance. 11) Administrative costs. Eligible activities 1 through 7 listed above must be carried out in the Gulf Coast region.
Grant$120.2MCloses 2026-10-31USOtherRESTORE Act Direct Component – Construction and Real Property Acquisition Activities
→Treasury is publishing multiple funding opportunity announcements (FOAs) for its RESTORE Act grant programs. This announcement applies only to the Direct Component and is only for applications for eligible construction and real property acquisition activities, including environmental restoration projects and including projects with or without a non-federal cost-share for another federally funded project or program. To apply for eligible activities that do not involve any construction, land acquisition, or environmental restoration, applicants should use the non-construction funding opportunity announcement (GR-RDC-25-002). All construction and real property acquisition activities, and any activity that requires a permit from a federal or state agency, including natural resource restoration projects, should be submitted under this construction and real property acquisition funding opportunity announcement. Trust Fund amounts are available to carry out eligible activities described in the RESTORE Act and Treasury’s implementing regulations at 31 CFR 34.201. These are: 1) Restoration and protection of the natural resources, ecosystems, fisheries, marine and wildlife habitats, beaches and coastal wetlands of the Gulf Coast region. 2) Mitigation of damage to fish, wildlife, and natural resources. 3) Implementation of a Federally- approved marine, coastal, or comprehensive conservation management plan, including fisheries monitoring. 4) Workforce development and job creation. 5) Improvements to or on State parks located in coastal areas affected by the Deepwater Horizon oil spill. 6) Infrastructure projects benefitting the economy or ecological resources, including port infrastructure. 7) Coastal flood protection and related infrastructure. 8) Promotion of tourism in the Gulf Coast region, including promotion of recreational fishing. 9) Promotion of the consumption of seafood harvested from the Gulf Coast region. 10) Planning assistance. 11) Administrative costs. Eligible activities 1 through 7 listed above must be carried out in the Gulf Coast region.
Grant$120.2MCloses 2026-10-31USOther
Always confirm details on the official source before applying — see our methodology.