CA18222 - RTBC - SHGH - MPCE BED STORE
The works comprise the phased refurbishment and reconfiguration of an existing area within St Helier Hospital to provide a new Bed Store and Medical Records Office. The successful contractor shall undertake all necessary architectural, mechanical, electrical and associated enabling works required to deliver a fully operational facility in accordance with current NHS Health Technical Memoranda (HTMs), Building Regulations and Trust standards. The scope of works includes, but is not limited to: Establishment of fully compliant infection prevention and control measures, including dust containment, temporary partitions, protection of adjacent hospital areas and phased working. Internal strip-out and removal of redundant fixtures, fittings, doors, partitions and associated services. Formation of new fire-rated partitions, alterations to existing openings and installation of new FD60 doorsets with associated ironmongery, glazing and access control modifications. Alterations to internal layouts to accommodate the proposed Bed Store and Medical Records Office, including relocation of doors and sink positions where required. Installation of new joinery, worktops, cupboards, shelving and associated fittings. Mechanical alterations including domestic hot and cold water services, drainage modifications, insulation, relocation of sanitary fittings and associated builders' work. Electrical alterations including strip-out of existing installations, complete rewiring where required, new containment, lighting, emergency lighting, small power, fire alarm modifications and associated testing and commissioning. Medical gas modifications where identified within the contract documents, undertaken by competent specialists in accordance with HTM 02-01 requirements. Builders' work associated with all mechanical and electrical installations, together with making good and reinstatement of all disturbed finishes. Testing, commissioning, certification, provision of as-built documentation and handover of all systems upon completion. All works shall be undertaken within a live acute hospital environment, maintaining safe operation of adjacent clinical services and complying with all Trust permit-to-work procedures, infection prevention requirements, NHS standards and statutory legislation. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18222. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18222 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Don't miss the next one like this
New construction grants in GB open all the time. Get a free weekly email with only the ones that match — nothing else.
Want help winning this?
Enter your email and we'll send the official application link, deadlines and pointers right away — free. Want a hand? Tick the box and we'll introduce you to a vetted grant or bid writer. The intro's free, and you only pay if you choose to work with them.
Related opportunities
See all alternatives →More grants — Construction · GB
DNWP0073 - Lot 1B/In-SEP ID - Controlled Area Initial Decommissioning Operations
→The anticipated scope for DNWP0073 is indicatively only. The Contractor requires support to the Inside Controlled Area (In-SEP) Decommissioning Operations. This will take the form of the provision of resource, up to 30 Full Time Equivalent (FTE), with an appropriate ratio of blue:white collar resources to be determined by the Subcontractor to best meet the Initial Decommissioning (ID) activities required by the Contractor. A current contract is in place until 31st March 2027 to prove the concept and develop an initial operating capability. This EOI relates to the longer-term works anticipated to commence thereafter, with an estimated duration of 24 months. The tasks undertaken will be broad and varied, and will be located in existing In-SEP and any future In-SEP buildings. Broadly, the Subcontractor will be required to provide Operational Support to the ID capability, build upon the previously developed ID capability, drive future improvements and assist in building scope of ID workload. Specific work and details will be decided by the ID In-SEP, Delivery Board and locally on plant at Plant Operations Control Centres (POCCs). Initial works will include waste removal, waste packaging and despatch and size reduction. Deplanting, involving the removal, lifting, size reduction and transport of redundant plant will also be required. Works will grow and develop in complexity as the capability matures, subject to providing ongoing Value for Money. (VFM) Tasks which meet the definition of 'Construction' (CDM 2015 Part 1 Regulation 2) should now be anticipated and appropriate management and supervision arrangements incorporated. This Contract Opporutnity represents a long-term commitment by the Contractor to further develop the Suitably Qualified and Experienced Person (SQEP) workforce of the Subcontractor to undertake works in uniquely hazardous facilities requiring prior knowledge and experience. The Subcontractor will be responsible for the design of all temporary works, this is anticipated to primarily be access/scaffolding but may also include design of lifting plans. The Subcontractor will ensure a safe sequence is adhered to for all activities. This may require the use of Contractor's structural/mechanical engineer on an ad-hoc basis. The Subcontractor shall integrate and co-ordinate its design with the following design of the Contractor and Others. The Subcontractor shall submit all temporary works plans to the Project Manager for acceptance prior to erection. The Subcontractor will be responsible for ensuring an appropriate level of checking and approval for their designs. The review period for the Project Manager to review the Review Documents is up to 2 weeks (10 working days). No temporary works will be erected until the Review Documentation has been authorised by the Project Manager. Important: Delivery is within a live operational environment, and scope is subject to change. Additional information: https://www.linkedin.com/company/a2r-altrad-atkinsrealis-remediation https://www.gov.uk/government/news/sellafield-ltd-awards-high-hazard-risk-reduction-framework-contract
Tender$27.2MCloses 2026-09-17GBConstructionCA18389 - Leeds College of Building - Principal Contractor
→Leeds College of Building are looking for a Principal Contractor to undertake the design, construction, management and delivery of refurbishment works to the newly named CTEC Building, located on Byron Street, Leeds. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18389. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18389 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Tender$19MCloses 2026-09-21GBConstructionSUPPLY CHAIN NOTICE - WC1996742- NDT TESTING OF PSD TANKS T3 & T6, AKROTIRI, CYPRUS
→The work described below will be undertaken for the two tanks one at a time: - Out of service inspection, including non-destructive examination and testing, grit blasting and recoating of the tank bottom and part of the shell plates - The rectification of any repairs identified following the NDT testing Location: Akrotiri Petroleum Supply Depot (PSD), CYPRUS The Provisional Key Tender dates for the project are as follows: - Expression of interest: 10/08/2026 - Expression of interest return: 31/08/2026 - Invitation to Tender: 07/09/2026 - Tender Return Date: 12/10/2026 - Contract award: 04/01/2027 - Commencement of work: 07/01/2027 - Completion of work: 19/07/2027 The currency of this project is Euro (€). The location of this project is Akrotiri, Cyprus (British Forces). Additional information: Any company wishing to participate in this tender should complete the Pre-Qualification Questionnaire (PQQ) and the EOI form which are attached and return them electronically to the above email address by no later than 12:00 EET on 31/08/2026. For companies that have submitted a PQQ within the last 12 months, there is no requirement to re-submit it. They must provide the details of their last PQQ submission to guarantee inclusion on the invitation list.
Tender$81.2MCloses in 3 daysGBConstructionBarrow Centre, Mount Edgcumbe - Fire Repair Works
→TENDER DOCS AVAILABLE AT: https://procontract.due-north.com/Advert?advertId=f8e433d6-0090-f111-813c-005056b64545 The project concerns the refurbishment of the Mount Edgcumbe Barrow Centre following damage sustained to the accommodation block by a fire on the afternoon of 04 February 2025. The primary objective of the project is to re-establish the commercial operations of the fire damaged parts of the Barrow Centre whilst giving due consideration to its surroundings, heritage and constraints. The Barrow Centre comprises the historic service yard and associated buildings for the Mount Edgcumbe Estate, now utilised as a visitors centre for the modern park and gardens. The central U-shaped stable block consists of a two and three storey mixed-use building containing a cafe, shops, workers flats and 2 holiday lets. The fire damaged section of the property forming the focus of this project consists of the split level northern wing containing 2 holiday cottages, Yew Tree Cottage and Horseshoe Cottage, and 2 workers flats, numbers 3 and 6 which in total provided 8 no. bedrooms. The Mount Edgcumbe House and Country Park is jointly owned by Cornwall Council (CC) and Plymouth City Council (PCC). PCC are the insurance policyholders for the Park and remain the beneficiaries for any sums paid out under the insurance claim. An agreement between PCC and CC is that CC will progress the refurbishment works
Tender$1.5MCloses in 14 daysGBConstructionBLD-3163 Store 54 Independent Heating Solution - Delivery
→High level summary of the project includes: Undertaken roof repair as there are leaks throughout. Installation of roof insulation and suspended ceiling. Upgrade of all glazing and doors (including fire doors). Strip out of existing M&E services/plant. Installation of VRV/VRF system and ASHP. Upgrade of all lighting and ensuring complete electrical installation is ATEX/DSEAR compliant. Note, a Stage 3 design and report will be provided and we would expect a stage 4 design/report before we progress with the build stage.
Tender$1.4MCloses 2026-09-15GBConstructionManchester International Airport - Permanent Way Works
→The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: - Track renewals and modifications. - Plain line track installation. - S&C installation and modifications (where applicable). - Ballast excavation, placement and regulation. - Stressing, welding and rail adjustments. - Tamping and dynamic track stabilisation. - Possession planning and delivery support. - Associated rail plant and labour resources. - Testing, handback and assurance documentation.
Tender$3.4MCloses todayGBConstruction
People also viewed
Other grants visitors looked at from Epsom & St Helier University Hospitals NHS Trust.
CA18340 - R9309 - SHGH - A-Lower Board Replacement
→Epsom and St Helier University Hospitals NHS Trust is seeking competitive tenders from suitably qualified and experienced electrical contractors for the design and replacement of existing electrical distribution board SP-3-3-21, located within the A Block Lower Basement Plant Room at St Helier Hospital. The works comprise the provision of a complete, fully compliant and operational electrical distribution installation and shall include, but not be limited to: Detailed surveys, investigations, circuit tracing and verification of the existing electrical installation. Load monitoring and confirmation of existing and proposed electrical demand. Detailed electrical design, calculations and coordination with the existing hospital electrical infrastructure. Discrimination and protection coordination studies. Supply and installation of a new Form 4 compartmentalised panel board, nominally rated at 250A, subject to Contractor design verification. Provision of a new outgoing protective device from PB-2-1 and all associated modifications. Installation of approximately 50 metres of 120mm² 4-core XLPE/SWA/LSF submain cable, subject to final design and site verification. Provision of a separate CPC, subject to final design calculations. New cable containment, supports, brackets and associated infrastructure where required. CT metering enclosure and associated metering provisions. Cable termination chambers and associated accessories. Identification, isolation, disconnection, transfer, reconnection and testing of all retained outgoing circuits from SP-3-3-21. Removal and lawful disposal of the existing distribution board and redundant associated equipment. Earthing and bonding modifications. Builder's work, fire stopping and making good. Full inspection, testing, commissioning, operational proving and certification. Thermographic inspection following energisation. Record drawings, O&M documentation, asset information, training and handover. The works will be undertaken within a live operational acute hospital environment. Particular importance shall therefore be placed on continuity of electrical supplies and management of shutdown risk. The Contractor shall undertake a comprehensive Isolation Impact Assessment and develop detailed switching, shutdown, temporary-supply, contingency and rollback arrangements in conjunction with the Trust's Authorised Person (Electrical), Estates representatives and affected clinical/service stakeholders. Tenderers shall include for all temporary electrical supplies necessary to maintain critical and operational services, which may include temporary distribution boards, cabling, generators and/or UPS systems where identified through survey and detailed planning. Tenderers shall allow for shutdowns, circuit transfers and commissioning activities to be undertaken outside normal working hours, including nights and weekends, where required by the Trust to minimise disruption to clinical services. The Contractor shall provide all labour, management, supervision, plant, materials, temporary works, specialist attendance, design, testing and documentation required to deliver a complete installation in accordance with the tender specification, drawings, CDM Pre-Construction Information and associated Contract Documents. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18340. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18340 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Tender$203KCloses in 7 daysGBConstructionCA18353 - R9321 - SHGH - Roof Works 2
→The Trust is seeking a suitably experienced roofing contractor to undertake repair and refurbishment works to sections of the existing flat roof serving the A2 Main Building. The works comprise approximately 170m² of roof area, subject to contractor verification and remeasurement on site, including removal of vegetation and debris, preparation and localised repair of the existing roof/deck, and application of an Instaseal Ultra Low VOC roof coating system, including treatment of associated upstands to approximately 150mm and all necessary detailing to provide a complete watertight installation. The works shall also include localised remedial treatment to defective roof substrates; temporary removal and reinstatement of supports/access grilles associated with existing rooftop plant where required; cleaning and unblocking of roof drainage hoppers/outlets; temporary removal and reinstatement of lightning protection; repairs and repointing to parapet walls; redressing and making good existing lead flashings; and associated making good. Approximately 20m² of localised deck repair and 40 linear metres of parapet repairs are to be allowed for, with final quantities verified on site. The scope additionally includes renewal of the identified external roof access/fire escape door with a new one-hour fire-resistant timber doorset, including associated ironmongery, lockset and weather protection, together with preparation and redecoration of existing metal railings and temporary safety provisions where railings require removal to facilitate the works. Access to the roof is anticipated via the existing external fire escape identified within the tender information. The contractor shall undertake all necessary surveys, verify dimensions and existing conditions prior to commencement, and provide all access, temporary works, protection, health and safety measures and infection-control precautions required for working within an operational NHS environment. The works are to comply with current Building Regulations, applicable NHS HTM guidance and Trust requirements. On completion, the contractor shall provide all testing, certification, product information and O&M documentation together with the specified 20-year product and workmanship guarantee To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18353. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18353 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Tender$102KCloses in 5 daysGBConstructionBJA FY 2026 Daniel Anderl Judicial Security and Privacy Program
→This is a notice of funding opportunity (NOFO) for the BJA FY 2026 Daniel Anderl Judicial Security and Privacy Program. This opportunity supports states and units of local government, including tribal governments that perform law enforcement functions, in creating and expanding efforts to protect the safety and security of federal judges by preventing the release of covered information about at-risk individuals and their immediate family members to ensure federal judges are able to administer justice fairly without fear of personal reprisal from individuals affected by the decisions they make in the course of carrying out their public duties. Many federal judges' personal information resides in state and local government records, databases, and registries that are publicly accessible and searchable and outside federal control. Grants to state and local entities support federal-state-local partnerships to protect federal judicial officers and their families. Funds awarded under this grant program must be used exclusively for protecting federal judges and their immediate family members as defined in statute. Applicants that have existing judicial protection programs should clearly delineate how grant funds will be used solely for federal judges and describe cost allocation methodologies to ensure appropriate separation of expenses. Expenses that also benefit other judges are acceptable, provided that any costs specific to state, local, or tribal judges are separately tracked and are not charged to this grant.
Grant$500KCloses 2026-10-15USProfessional ServicesCooperative Agreement for In Vivo High-Resolution Imaging for Inner Ear Visualization (U01 Clinical Trial Required)
→This funding opportunity aims to support high risk clinical trials for the development of in vivo high-resolution structural and functional imaging technologies for the living human inner ear. Proposed projects should focus on improving the resolution of current imaging techniques or developing new imaging techniques that can visualize inner ear structures in vivo with significantly greater detail and accuracy than currently possible. Structural and functional aspects, including visualizing dynamic elements, are important to developing new and improved techniques. Projects may also focus on developing new imaging probes or contrast agents that can enhance visualization of the inner ear structures. Research supported in response to this RFA is expected to significantly advance the ability to visualize auditory and vestibular components, such as hair cells, otoliths, membranes, ions, and vasculature, in detail in awake patients in a clinical setting using non-invasive techniques. To achieve this goal, a multidisciplinary team approach that takes advantage of the expertise of each team member is highly encouraged. Studies in humans must be proposed to develop,advance, or test the needed technology. Any intermediate studies must articulate a clear path of the proposed methodology to application in awake humans or define the limitations and the usefulness in anesthetized humans.
Grant$500KCloses 2026-10-01USHealth
Always confirm details on the official source before applying — see our methodology.