Alternatives to CA18222 - RTBC - SHGH - MPCE BED STORE
12 similar grants to CA18222 - RTBC - SHGH - MPCE BED STORE — matched by Construction · GB.
DNWP0073 - Lot 1B/In-SEP ID - Controlled Area Initial Decommissioning Operations
→The anticipated scope for DNWP0073 is indicatively only. The Contractor requires support to the Inside Controlled Area (In-SEP) Decommissioning Operations. This will take the form of the provision of resource, up to 30 Full Time Equivalent (FTE), with an appropriate ratio of blue:white collar resources to be determined by the Subcontractor to best meet the Initial Decommissioning (ID) activities required by the Contractor. A current contract is in place until 31st March 2027 to prove the concept and develop an initial operating capability. This EOI relates to the longer-term works anticipated to commence thereafter, with an estimated duration of 24 months. The tasks undertaken will be broad and varied, and will be located in existing In-SEP and any future In-SEP buildings. Broadly, the Subcontractor will be required to provide Operational Support to the ID capability, build upon the previously developed ID capability, drive future improvements and assist in building scope of ID workload. Specific work and details will be decided by the ID In-SEP, Delivery Board and locally on plant at Plant Operations Control Centres (POCCs). Initial works will include waste removal, waste packaging and despatch and size reduction. Deplanting, involving the removal, lifting, size reduction and transport of redundant plant will also be required. Works will grow and develop in complexity as the capability matures, subject to providing ongoing Value for Money. (VFM) Tasks which meet the definition of 'Construction' (CDM 2015 Part 1 Regulation 2) should now be anticipated and appropriate management and supervision arrangements incorporated. This Contract Opporutnity represents a long-term commitment by the Contractor to further develop the Suitably Qualified and Experienced Person (SQEP) workforce of the Subcontractor to undertake works in uniquely hazardous facilities requiring prior knowledge and experience. The Subcontractor will be responsible for the design of all temporary works, this is anticipated to primarily be access/scaffolding but may also include design of lifting plans. The Subcontractor will ensure a safe sequence is adhered to for all activities. This may require the use of Contractor's structural/mechanical engineer on an ad-hoc basis. The Subcontractor shall integrate and co-ordinate its design with the following design of the Contractor and Others. The Subcontractor shall submit all temporary works plans to the Project Manager for acceptance prior to erection. The Subcontractor will be responsible for ensuring an appropriate level of checking and approval for their designs. The review period for the Project Manager to review the Review Documents is up to 2 weeks (10 working days). No temporary works will be erected until the Review Documentation has been authorised by the Project Manager. Important: Delivery is within a live operational environment, and scope is subject to change. Additional information: https://www.linkedin.com/company/a2r-altrad-atkinsrealis-remediation https://www.gov.uk/government/news/sellafield-ltd-awards-high-hazard-risk-reduction-framework-contract
Tender$27.2MCloses 2026-09-17GBConstructionCA18389 - Leeds College of Building - Principal Contractor
→Leeds College of Building are looking for a Principal Contractor to undertake the design, construction, management and delivery of refurbishment works to the newly named CTEC Building, located on Byron Street, Leeds. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18389. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18389 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Tender$19MCloses 2026-09-21GBConstructionSUPPLY CHAIN NOTICE - WC1996742- NDT TESTING OF PSD TANKS T3 & T6, AKROTIRI, CYPRUS
→The work described below will be undertaken for the two tanks one at a time: - Out of service inspection, including non-destructive examination and testing, grit blasting and recoating of the tank bottom and part of the shell plates - The rectification of any repairs identified following the NDT testing Location: Akrotiri Petroleum Supply Depot (PSD), CYPRUS The Provisional Key Tender dates for the project are as follows: - Expression of interest: 10/08/2026 - Expression of interest return: 31/08/2026 - Invitation to Tender: 07/09/2026 - Tender Return Date: 12/10/2026 - Contract award: 04/01/2027 - Commencement of work: 07/01/2027 - Completion of work: 19/07/2027 The currency of this project is Euro (€). The location of this project is Akrotiri, Cyprus (British Forces). Additional information: Any company wishing to participate in this tender should complete the Pre-Qualification Questionnaire (PQQ) and the EOI form which are attached and return them electronically to the above email address by no later than 12:00 EET on 31/08/2026. For companies that have submitted a PQQ within the last 12 months, there is no requirement to re-submit it. They must provide the details of their last PQQ submission to guarantee inclusion on the invitation list.
Tender$81.2MCloses in 3 daysGBConstructionBarrow Centre, Mount Edgcumbe - Fire Repair Works
→TENDER DOCS AVAILABLE AT: https://procontract.due-north.com/Advert?advertId=f8e433d6-0090-f111-813c-005056b64545 The project concerns the refurbishment of the Mount Edgcumbe Barrow Centre following damage sustained to the accommodation block by a fire on the afternoon of 04 February 2025. The primary objective of the project is to re-establish the commercial operations of the fire damaged parts of the Barrow Centre whilst giving due consideration to its surroundings, heritage and constraints. The Barrow Centre comprises the historic service yard and associated buildings for the Mount Edgcumbe Estate, now utilised as a visitors centre for the modern park and gardens. The central U-shaped stable block consists of a two and three storey mixed-use building containing a cafe, shops, workers flats and 2 holiday lets. The fire damaged section of the property forming the focus of this project consists of the split level northern wing containing 2 holiday cottages, Yew Tree Cottage and Horseshoe Cottage, and 2 workers flats, numbers 3 and 6 which in total provided 8 no. bedrooms. The Mount Edgcumbe House and Country Park is jointly owned by Cornwall Council (CC) and Plymouth City Council (PCC). PCC are the insurance policyholders for the Park and remain the beneficiaries for any sums paid out under the insurance claim. An agreement between PCC and CC is that CC will progress the refurbishment works
Tender$1.5MCloses in 14 daysGBConstructionManchester International Airport - Permanent Way Works
→The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: - Track renewals and modifications. - Plain line track installation. - S&C installation and modifications (where applicable). - Ballast excavation, placement and regulation. - Stressing, welding and rail adjustments. - Tamping and dynamic track stabilisation. - Possession planning and delivery support. - Associated rail plant and labour resources. - Testing, handback and assurance documentation.
Tender$3.4MCloses todayGBConstructionBLD-3163 Store 54 Independent Heating Solution - Delivery
→High level summary of the project includes: Undertaken roof repair as there are leaks throughout. Installation of roof insulation and suspended ceiling. Upgrade of all glazing and doors (including fire doors). Strip out of existing M&E services/plant. Installation of VRV/VRF system and ASHP. Upgrade of all lighting and ensuring complete electrical installation is ATEX/DSEAR compliant. Note, a Stage 3 design and report will be provided and we would expect a stage 4 design/report before we progress with the build stage.
Tender$1.4MCloses 2026-09-15GBConstructionCA18370 - ITT 52/2026 - Bessbrook Community Centre - New Mini Digi Hub
→A project supported by PEACEPLUS, a programme managed by the Special EU Programmes Body (SEUPB) . Competent Contracting companies are hereby invited to tender to deliver Bessbrook Community Centre Upgrade and Refurbishment Works. Extension and various internal Works required as part of the creation of a community Digihub. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18370. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18370 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Tender$719KCloses 2026-09-17GBConstructionSt Mary the Virgin, Great Dunmow | Main Contractor for Internal Reordering Project
→St Mary the Virgin, Great Dunmow, is seeking tenders for a main contractor to deliver their National Lottery Heritage Fund project which involves a series of internal alterations to the historic church building. The scope of work includes: - Relocation of the font - Construction of internal partitions and supply and installation of accessible WC - Supply and installation of various bespoke joinery elements, including: storage cupboards, ramps, AV desk, raised platform, kitchenette etc. - Supply and installation of new floor construction and underfloor heating system at the west end - Lowering of the south porch internal floor level and associated remedial works - Construction of new mezzanine to the tower - Construction of new internal porch - Supply and construction of new external doors - New services and redecoration to works areas If you are intersted in receving the suite of tender documents for this opportunity, please contact john.bailey@thomasford.co.uk
Tender$675KCloses in 7 daysGBConstructionGB-York: Sports Campus Padel Canopy Installation
→With the recent addition of an outdoor Padel facility, and plans to expand, the University is now seeking to contract for the supply and installation of a canopy to protect the facility and decrease weather‐related shutdowns. York St John intends that the facility remains operational for as much of the construction period as is reasonably practicable. Additional information: The contracting authority considers that this contract may be suitable for economic operators that are small or medium enterprises (SMEs). However, any selection of tenderers will be based solely on the criteria set out for the procurement.
Tender$679KCloses 2026-09-14GBConstructionSUPPLY CHAIN NOTICE - : WC1857703 - (EP0060) Replace the asbestos wall and roof cement cladding with corrugated galvanised steel sheeting, Episkopi, Cyprus
→(EP0060) Replace the asbestos wall and roof cement cladding with corrugated galvanised steel sheeting, Episkopi, Cyprus The scope of works includes a range of structural alterations, demolition works and new installations throughout the building. The demolition and alteration works include the safe removal of asbestos-containing materials, including roof sheets, canopies, wall cladding and ceiling debris, which will be carried out by a licensed contractor. Removals include internal timber coverings, partitions, doors and windows, and regarding the roof all the purlins, timber rafters and roof trusses with one exception. A new roof will be supplied and installed including steel trusses, bracings, SHS beams, Z-purlins and RHS girts for supporting the false ceiling. The roof and the walls will be cladded with rockwool insulated panels and a suspended plasterboard ceiling will be installed. The works further include the erection of a blockwall, capping beams, installation of aluminium doors and windows, an electrically operated roller shutter, uPVC gutters and rainwater downpipes, together with internal and external decoration. The scope also allows for the required mechanical removals and associated electrical works. The Provisional Key Tender dates for the project are as follows: - Expression of interest return: 31/08/2026 - Invitation to Tender: 10/09/2026 - Tender Return Date: 16/10/2026 - Contract award: 11/01/2027 - Commencement of work: 01/02/2027 - Completion of work: 15/09/2027 Work commencement and completion dates will be subject to MOD DIO's agreement, as they will be dictated by the Operating Authority to avoid Operational Restrictions. The currency of this project is Euro (€). The location of this project is Cyprus (British Forces, Episkopi). Additional information: Any company wishing to participate in this tender should complete the Pre-Qualification Questionnaire (PQQ) and the EOI form which are attached and return them electronically to the above email address by no later than 12:00 EET on 31/08/2026. For companies that have submitted a PQQ within the last 12 months, there is no requirement to re-submit it. They must provide the details of their last PQQ submission to guarantee inclusion on the invitation list.
Tender$729KCloses in 3 daysGBConstructionCA18314 - Refurbishment of 22 Tennis Courts Over 6 Sites
→Spelthorne Borough Council (the Council) has responsibility for the installation, management and maintenance of tennis courts in our parks and open spaces. Leisure and Community Development are seeking proposals from Tenderers for the works detailed in this specification to refurbish tennis courts and replace the surrounding fencing. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18314. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18314 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Tender$256KCloses 2026-09-15GBConstructionSupply Chain Notice: WC1918109-AD230S_CONSTRUCTION OF NEW GENERATOR SHED AND EQUIPMENT RELOCATION, AKROTIRI, CYPRUS
→The scope of works includes the following: - Remove the stand-by generator and fuel tank from existing container and store for future use. - Remove and dispose of the existing container. - Construct the new shed at the original location and re-install the stand-by generator and fuel tank. - Provide a temporary generator to cover for emergency power while the works take place. - Overhaul generator fuel pumps and controls and installation of a client-furnished 5,000 litre fuel tank and all associated fuel line pipework, valves and accessories. - Carry out new electrical installation including cables to and from the automatic changeover switch, small power and lighting. - Supply and installation of new intake and discharge louvres, sound attenuators and motorised dampers. The Provisional Key Tender dates for the project are as follows: - Expression of interest: 14/08/2026 - Expression of interest return: 11/09/2026 - Invitation to Tender: 18/09/2026 - Tender Return Date: 30/10/2026 - Contract award: 19/02/2027 - Commencement of work: 05/03/2027 - Completion of work: 23/07/2027 The currency of this project is Euro (€). The location of this project is Akrotiri, Cyprus (British Forces). Additional information: Any company wishing to participate in this tender should complete the Pre-Qualification Questionnaire (PQQ) and the EOI form which are attached and return them electronically to the above email address by no later than 12:00 EET on 11/09/2026. For companies that have submitted a PQQ within the last 12 months, there is no requirement to re-submit it. They must provide the details of their last PQQ submission to guarantee inclusion on the invitation list. Pre-Qualification Questionnaire (PQQ) Expression of Interest form
Tender$406KCloses in 14 daysGBConstruction