Epsom & St Helier University Hospitals NHS Trust grants
4 opportunities
CA18222 - RTBC - SHGH - MPCE BED STORE
→The works comprise the phased refurbishment and reconfiguration of an existing area within St Helier Hospital to provide a new Bed Store and Medical Records Office. The successful contractor shall undertake all necessary architectural, mechanical, electrical and associated enabling works required to deliver a fully operational facility in accordance with current NHS Health Technical Memoranda (HTMs), Building Regulations and Trust standards. The scope of works includes, but is not limited to: Establishment of fully compliant infection prevention and control measures, including dust containment, temporary partitions, protection of adjacent hospital areas and phased working. Internal strip-out and removal of redundant fixtures, fittings, doors, partitions and associated services. Formation of new fire-rated partitions, alterations to existing openings and installation of new FD60 doorsets with associated ironmongery, glazing and access control modifications. Alterations to internal layouts to accommodate the proposed Bed Store and Medical Records Office, including relocation of doors and sink positions where required. Installation of new joinery, worktops, cupboards, shelving and associated fittings. Mechanical alterations including domestic hot and cold water services, drainage modifications, insulation, relocation of sanitary fittings and associated builders' work. Electrical alterations including strip-out of existing installations, complete rewiring where required, new containment, lighting, emergency lighting, small power, fire alarm modifications and associated testing and commissioning. Medical gas modifications where identified within the contract documents, undertaken by competent specialists in accordance with HTM 02-01 requirements. Builders' work associated with all mechanical and electrical installations, together with making good and reinstatement of all disturbed finishes. Testing, commissioning, certification, provision of as-built documentation and handover of all systems upon completion. All works shall be undertaken within a live acute hospital environment, maintaining safe operation of adjacent clinical services and complying with all Trust permit-to-work procedures, infection prevention requirements, NHS standards and statutory legislation. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18222. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18222 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Tender$400KCloses 2026-08-28GBConstructionCA18216 - R9309 Electrical Upgrade EGH Ph 2
→The Trust intends to undertake an upgrade of the electrical infrastructure at Epsom General Hospital as part of the wider Electrical Infrastructure Condition Report (EICR) compliance programme. This package of works addresses identified defects and non compliances within the electrical and lighting installations across all floors of the Headley, Bradbury, and Denbies Wings of the estate. As part of the EICR survey findings, the scope of works includes, but is not limited to: • Existing electrical validation • Decommissioning and removal of existing equipment • Installation, testing, and commissioning of 43 no. distribution boards and panels • Provision of all necessary enabling works, including temporary supplies and backfeeds required to maintain continuity of services throughout the works In addition, the contractor will be required to manage the provision (supply and installation) of compliant emergency lighting fittings and associated connections across the Headley and Bradbury Wings, delivered by THORLUX, the Trust appointed supplier. You, along with other contractors, are invited to submit a tender for the provision of works described as the R9309 Electrical Upgrade EGH Ph 2 project at Epsom General Hospital, Epsom & St Helier University Hospitals NHS Trust. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18216. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18216 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Tender$266KCloses in 3 daysGBConstructionCA18141 - R9317 - SHGH - Walkway Improvements
→The project comprises the refurbishment and improvement of external pedestrian pathways adjacent to the Main Building at St Helier Hospital. Works include reconstruction of existing footpaths, local drainage improvements, installation of safety railings, renewal of road and pedestrian markings, replacement of signage, and associated external works to improve accessibility, safety and durability. All work will be carried out in a live hospital environment, with phased delivery, maintained safe pedestrian and emergency access, and full compliance with current Building Regulations, NHS HTM guidance, and Trust infection prevention requirements. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18141. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18141 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Tender$200KCloses in 3 daysGBConstructionCA18229 - B1 Ward Nurse Call Replacement
→Replacement of the existing wireless nurse call system with new hard wired system. To access this competition: Registered: Login to https://suppliers.multiquote.com and view the opportunity CA18229. Not registered: Visit https://suppliers.multiquote.com then register and quote CA18229 as the reason for registration. Any queries please contact MultiQuote on 020 3920 8054.
Tender$67Closes in 7 daysGBConstruction