Transport of slabs
→This opportunity supports the delivery of the HS2 programme and involves the transportation of precast concrete slab-track units from the PACADAR UK factory to multiple locations along the HS2 route. The requirement is for approximately 12,000 slabs, equating to around 2,400 HGV loads, making it a significant logistics package with a consistent volume of work. Suppliers will be required to provide suitable HGV transport capable of safely carrying five slab units per load while complying with all relevant transport, safety and load restraint regulations. Deliveries will be made to various locations along the HS2 corridor, with loading at the factory and offloading at site undertaken by others. Interested suppliers will be asked to demonstrate their transport capability, available fleet capacity and proposed delivery approach, together with competitive commercial rates. Further information on the scope, delivery requirements, indicative volumes and pricing structure is available within the attached documentation.
Tender$134KCloses in 13 daysGBTransport